My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/1989
CBCC
>
Meetings
>
1980's
>
1989
>
5/23/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:01 PM
Creation date
6/12/2015 2:51:47 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/23/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AY 2 3 1989 <br />i 94e <br />UPDATING OF WATER SYSTEM MAPS AND ANALYSES OF WATER SYSTEM - 1989 <br />The Board reviewed memo from Director Pinto: <br />DATE: MAY 11, 1989 <br />►TO: JAMES E. CHANDLf <br />COUNTY ADMINISTFROM: TERRANCE G. PINDIRECTOR OF UTISERVICES <br />SUBJECT: UPDATING OF WATER SYSTEM MAPS AND <br />ANALYSES OF WATER SYSTEM - 1989 <br />PREPARED AND STAFFED BY: WILLIAM F. McCAIN <br />PROJECTS ENGINEER <br />DEPARTMENT OF UTILRVICES <br />BACKGROUND <br />E <br />Since short -listing of consulting firms took place, we have decided <br />to set up a continuing services Work Authorization with Boyle <br />Engineering Corporation. The purpose of this Work Authorization is <br />to allow us to continue to update the water system maps, have water <br />distribution system analyses performed, and update the Master Plan <br />as requested by the Utilities Department. <br />ANALYSIS <br />The general services are outlined in the attached Work <br />Authorization, see section "Scope of Services." Each specific task <br />will be outlined on a case-by-case basis and will be authorized by <br />the Director of Utility Services. The cost of such services is <br />outlined in Exhibit A, "Standard.>.Hourly Rate Schedule." The funds <br />for this Work Authorization will come from Account No. <br />#471-219-536-033.13. The upper end limit we will spend in this year <br />is $15,000.00. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Indian River County Board of County Commissioners approve the <br />signing of the attached Work Authorization Number 2. <br />Commissioner Eggert asked if this is an on-going thing, and <br />Director Pinto noted that depends on how many as -built plans come <br />in. Every time one comes in, we sent it over and they put it on <br />the program. <br />Commissioner Scurlock asked if Utilities is happy with the <br />services of Boyle Engineering, and Director Pinto advised that <br />they are for now and actually the way we are set up now, we have <br />to continue with them. <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.