Laserfiche WebLink
JUN 1.8 1989, COOK `j FA Q <br />5. Surrounding Uses/Zoning: <br />North: vacant/RM-6 <br />South: golf course/RM-6 <br />East: golf course, planned for POD I <br />(residential)/RM-6 <br />West: proposed Indian River Boulevard, vacant/RM-6 <br />6. Environment and Site Conditions: <br />The site contains some significant hardwood "hammock" areas: <br />Out of 34 existing "protected" trees on site (all oak), only <br />7 are to be removed; 27 are to be preserved. In staff's <br />opinion, the facility has been well-designed to preserve <br />trees, and thus adequately protect the site's main <br />environmentally significant characteristics. <br />7. Landscaping and Buffering: <br />A 25' (minimum) landscape perimeter buffer area is provided <br />around the entire site. The combination of preserved trees, <br />planted trees, and hedging will exceed landscape require- <br />ments. The proposed perimeter buffering meets or exceeds <br />"Type B" landscape screening requirements. <br />8. Open Space: Required: 50% (total PRD) <br />Provided: 58%+ (total PRD) <br />[4 acre site: 49%] <br />9. Recreation Space: Requirement applies only to residential <br />unit development. Overall PRD exceeds requirements with golf <br />course, tennis, club, and bikepath facilities. <br />10. Drainage: A stormwater permit will be issued along with the <br />land development permit. Public Works has approved the site <br />plan drainage layout. <br />11. Utilities: Water and sewer services will be provided by the <br />County. Utilities permits will be obtained prior to issuance <br />of a land development permit. <br />12. Traffic Circulation: The site is to be accessed differently <br />in the two phases of the project. In the first phase., the <br />project is to be accessed by a temporary stabilized, unpaved <br />driveway which is to connect `to the existing Grand Harbor <br />Boulevard. The route of this road is to run within the <br />Indian River Boulevard right-of-way. In the second phase, a <br />permanent paved driveway is to connect to the constructed <br />Boulevard at an approved future Boulevard median cut which is <br />to serve several parcels that "line up" with the median cut. <br />The applicant has submitted a certified cost estimate for the <br />phase 2 driveway construction as well as for construction of <br />a deceleration lane, and -has agreed to escrow funds to <br />guarantee construction. During land development permit <br />review, Public Works will have to approve the alignment and <br />specifications of the temporary driveway, as well as arrange- <br />ments for temporary re -alignment during Boulevard con- <br />struction. <br />Public Works has requested that, as part of the land develop- <br />ment permit application, the applicant submit a traffic <br />impact analysis and commit to any traffic improvements <br />indicated as necessary by the analysis. The applicant has <br />agreed to this condition; no improvements are known to be <br />needed at this time. The facility will be connected to both <br />28 <br />- M M <br />