Laserfiche WebLink
JUN 12 1989 BOOK 77 <br />Director Davis stressed that they are recommending 4' paved <br />shoulders for all collector roadways. Actually the shoulder will <br />be used as a bicycle lane but won't be designated as such. It <br />just will designated as a paved shoulder. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the list of Road Resurfacing projects as recom- <br />mended by staff with the addition of a 4' paved <br />shoulder to 66th Avenue. <br />ENGINEERING DESIGN SERVICES CONTRACT - ASSESSMENT PAVING PROJECTS <br />(CHERRY LANE, R.D.CARTER RD., AND WALKER <br />AVE.) <br />The <br />Board reviewed memo from County <br />Engineer James White: <br />----------------------------------------------------------- <br />TO: <br />James Chandler <br />------ <br />3. <br />County Administrator <br />Ave) Engineering Design <br />18,400. <br />;- <br />Aerial Photography <br />THROUGH: <br />James W. Davis, P.E. <br />Public Works Director.,- .,,, <br />5. <br />Printing & Reproduction (Estimated) <br />500• <br />FROM: <br />James D. White, P.E. <br />County Engineer <br />SUBJECT: <br />Engineering Design Services Contract <br />- Assessment <br />Paving Projects <br />1 - 33rd Street (Cherry Lane) <br />between 58th Ave and <br />66th Ave <br />2 - 1st Street SW (R. D. Carter <br />Rd) between 58th Ave <br />and 66th Ave 1 <br />3 - 26th Street (Walker Ave) <br />from 58th Ave to Village <br />Green Phase II <br />DATE: June 1, 1989 <br />--------------------------- <br />DESCRIPTION AND CONDITIONS <br />Staff has completed negotiations with Marshall, McCully and <br />Associates for Engineering design services for three (3) <br />assessment paving projects. Negotiations were broken off with <br />the other two of three short listed firms before successfully <br />negotiating this contract. <br />The cost of the services are as listed below: <br />1. <br />33rd Street (Cherry <br />Avenue) Engineering Design <br />$ 25,500. <br />2. <br />1st Street SW (R.D. <br />Carter Rd) Engineering Design <br />25,500. <br />3. <br />26th Street (Walker <br />Ave) Engineering Design <br />18,400. <br />4. <br />Aerial Photography <br />(Estimated) <br />7,800. <br />5. <br />Printing & Reproduction (Estimated) <br />500• <br />Total $ 77,700. <br />Item #4 and #5 are direct billing items paid at cost by the <br />County. <br />84 <br />