Laserfiche WebLink
�A" I 'V 89 <br />MOX 77 r,sIA 504 <br />Mr. Bibo stated that they normally would sit down again with <br />the Commission and committee and determine what items would be <br />considered to be left off of the building or redeveloped, in.one <br />way or another. It usually is very difficult to get the line <br />item costs from the contractors, but whatever they can get would <br />be of help. They do have an estimator on their staff and they <br />take off the building according to the materials, labor, etc. <br />Commissioner Bird did not see where sitting down with lay <br />people on the Commission and the Library Committee would be the <br />answer. He believed he would want to talk to the estimators of <br />each of these other construction companies and see just what it <br />is in the building that is driving up the costs. <br />Mr. Bibo agreed but noted that it may turn out that none of <br />this is out of reason and it may be there are some areas that <br />would have to be cut. <br />Administrator Chandler agreed that we could contact the <br />other bidders and see if they would voluntarily supply us with, <br />some of this information. Legally they do not have to do this. <br />Attorney Collins stressed that the contract does say that if <br />the fixed limit of construction cost is exceeded by the lowest <br />bona fide bid, the architect may cooperate in revising the <br />project's scope and quality as required to reduce the <br />construction cost, and if the owner chooses to proceed in this <br />manner, the architect without additional charge shall modify the <br />drawings, documents, etc., as necessary to comply with the fixed <br />limit. <br />Discussion continued regarding our options regarding <br />accepting Ivey's bid as valid or rejecting it as not being valid, <br />etc., and Administrator Chandler believed it would have to be a <br />rejection on the basis that an error was made in the transmittal <br />of that bid. <br />Commissioner Scurlock believed that once that bid is <br />declared invalid, we then would have to go to the next low bid <br />and reject all bids. <br />62 <br />