My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/15/1989
CBCC
>
Meetings
>
1980's
>
1989
>
8/15/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:01:03 PM
Creation date
6/15/2015 4:50:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/15/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We are currently preparing to take Gifford and Grand Harbor off of <br />the city water system, which will take the plant to its maximum <br />capacity. Since the rainy season has started, a peak demand as <br />great as that listed above, should not be expected until next <br />season. Based on the above information, it is evident that the <br />County needs to expand the plant as soon as possible. The lump sum <br />engineering costs associated with this project are $162,834.00 (see <br />attached Work Authorization). <br />The funds for this project will come from Account No. <br />472-000-169-041.00. <br />ECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the attached Work <br />Authorization with Camp Dresser and McKee for the expansion of the <br />South County Reverse Osmosis Plant. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Eggert, the Board unanimously approved <br />Work Authorization with Camp Dresser & McKee, Inc. <br />in the amount of $162,834 for engineering services <br />related to the treatment capacity increase for the <br />South County R.O. Plant. <br />ENGINEERING SERVICES WORK AUTHORIZATION <br />DATE: November 8, 1988 1-70RK AUTHORIZATION NO. FOR CONSULTING SERVICES <br />COUNTY NO. CAMP DRESSER & McKEE INC. CDPI PROJECT NO. 6706-23 <br />(CONSULTANT) <br />I. PROJECT DESCRIPTION <br />Consulting engineering services related to the Indian River County <br />Water Treatment Plant Expansion of the South County RO Water Treatment <br />Plant. <br />II. SCOPE OF SERVICES <br />Camp Dresser & McKee Inc. (CDM) will prepare a Preliminary Design that <br />will assess the current treatment capacity of the South County RO <br />Plant, establish the necessary capacity for expansion and outline the <br />recommended methods for expansion. Subsequently, CDM will also <br />prepare a final design including plans and specifications, permitting <br />assistance and services during bidding. <br />III. CONSULTING ENGINEER INSURANCE REQUIREMENTS <br />A. Workers Compensation Insurance in accordance with Florida <br />Statutes. <br />B. Comprehensive and Automotive Liability with a minimum coverage of <br />$100,000/$300,000 per occurrence for bodily injury or accidental <br />death. <br />C. Comprehensive General Liability with a minimum limit of <br />$100,000/$300,000 covering property damage. <br />D. Liability fox Property Damage, while operating motor vehicle, with <br />minimum limits of $100,000 per occurrence. <br />43 77 <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.