Laserfiche WebLink
r <br />Question arose as to whether there isn't a pond on this <br />site, and Mr. Williams explained that the District's position is <br />that we are modifying an existing system and increasing <br />pollutants from the runoff on the parking lot; so, we need to <br />provide our own water quality and retention on site and not <br />discharge directly into the ponds. Mr. Williams advised that he <br />"has calls in to Stottler, Stagg regarding how long it will take <br />to make these modifications. The plus is that it may reduce the <br />amount of structure for inlets and piping under the parking lot; <br />so, it may actually be a wash as far as cost goes. <br />Commissioner Bowman felt that possibly going to pervious <br />paving would be cheaper than going to grassy swale. <br />Mr. Williams noted that Engineer Darrell McQueen went with <br />him to St. John's as he is the engineer for .Sebastian Lakes. Mr. <br />McQueen said the percolation in that area is not all that good; <br />he did not feel the changes St. John's were asking for would be a <br />major impact and he offered to comment on what was needed. Mr. <br />Williams continued that he has been told we can have construction <br />drawings by the week of October 23rd. He further noted that he <br />did ask Mr. Bibo several times during the last year how we were <br />coming along on this permit, and we were assured everything was <br />fine. <br />Administrator Chandler wished to stress that this redesign <br />is being done at no cost to the county. There has been a change <br />in the architect assigned to our project, and since he has begun <br />working with us, we have had more cooperation. He seems to be <br />more realistic in his design, and is giving us better timely <br />response. <br />Commissioner Eggert emphasized the need for haste. <br />BID #89-92 - UTILITY SUPPLIES 8 MATERIAL <br />General Services Director "Sonny" Dean reviewed the <br />following: <br />32 <br />2 989 BooK <br />