My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/1989
CBCC
>
Meetings
>
1980's
>
1989
>
10/24/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:26:28 AM
Creation date
6/16/2015 8:09:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/24/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remainder for approximately $17,000 based on the prorated <br />acreage values. The net cost to the County would be <br />approximately $9,116.25. <br />Alternative No. 2 <br />As per the existing County code, the lot owner would be <br />requested to dedicate to the County, without compensation, <br />35' of right-of-way to meet local road standards and be <br />compensated for the additional 20' needed to meet collector <br />road standards. The property owner would still not be able <br />to build a reasonable size single family home on the land <br />due to setback deed restrictions. If deed restrictions were <br />relaxed, a suitable dwelling could be constructed, however, <br />the Delange's intentions are to construct a large house <br />which could not be accomplished on the site. <br />RECOMMENDATION AND FUNDING <br />As has been the case where substantial right-of-way needs impact <br />the viability of building a suitable single family home on a <br />residential lot, staff recommends that the County offer to <br />purchase the lot for $26,116.25 and to resell the remainder after <br />right-of-way needs are provided for. Funding to be from Zone 8 <br />Traffic Impact Fee Account (balance on 9-9-89 was approximately <br />$400,000.) <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Bowman, Commissioner Bird and Chairman <br />Wheeler being absent, the Board unanimously (3-0) <br />approved staff recommendation regarding purchase of <br />the above described lot for $26,116.25 and future <br />resale of the remainder. <br />(ORIGINAL WARRANTY DEED ON FILE IN OFFICE OF CLERK <br />TO BOARD) <br />GOLDEN SANDS PARK DUNE CROSSOVER, CHANGE ORDER No. 2 <br />The Board reviewed memo from the Public Works Director: <br />TO: James E. Chandler, <br />County Administrator <br />FROM: James W. Davis, P.E., 97t,405)___Public Works Director <br />SUBJECT: Golden Sands Park Dune Crossover <br />Change Order No. 2 <br />REFERENCE: Al Sandelli, The Masters Group, Inc <br />to Ruben Trejo dated 10-10-89 <br />DATE: October 16, 1989 <br />DESCRIPTION AND CONDITIONS <br />During construction of by-pass stairways at the main dune <br />walkover structure at Golden Sands Park, the Contractor has <br />37 <br />OCT 2 4 1989 <br />BOOK .78 PAGE 2DL <br />
The URL can be used to link to this page
Your browser does not support the video tag.