My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/1989
CBCC
>
Meetings
>
1980's
>
1989
>
10/24/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:26:28 AM
Creation date
6/16/2015 8:09:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/24/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT 2 4-,1_ - <br />• 0-1.44NKE <br />ORDER <br />AIA VC)CUMEN i (.;7()1 <br />i11•.t I tth•m !r. <br />c )WNI <br />ARCM IR r <br />t ONI!:\r ICY. ,x <br />I11.11) i <br />t11i11'r: 1I <br />BOOK 78 PAGE I�5c i <br />I'I' )1Ei r: Golden Sands Dune Walkover <br />(n;u.e, adrlre•.$) North A1A <br />TO (Contractor): <br />L <br />r )R1)11.! N a.)t.1Ii1 K: <br />2 <br />INI I IA f1OIv l)A1 E: October 16, 1989 <br />� <br />1 AR:!ilif.CT'S !'hC)ILC•T Nt): <br />The Masters Group I <br />CON I RAC FOR: <br />3553 S. Indian River Drive <br />Fort Pierce, Fi. 34982 <br />(ONIRA(1 f1AlL: Sept. 15, 1989 <br />You are directed to make the following changes in this Contract. <br />Pull structure plumb and remove rack utilizing nylon web slings and <br />coffin hoists; <br />Set and drill five sets of cross -bracing at flex points <br />Total cost $1,152 <br />Not val•d until signed by both the n.Vner and nrch•tect. <br />'Signaturr, of ;he Contractor indicates his agmement herewith. Including any adjustment in the Contra, t cum err Contract Time <br />The original (Contract Sum) (Guaranteed Maximum Cost) was 8,475.00 <br />Net change by previously authorized Change Orders $ 495.00 <br />The (C:ontrar.t Sum) (Guaranteed Maxrrnunt Cost) prior to this Change Orderwas ..... $ .8,970.00 <br />The ;Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unc.11,•nged) <br />by this Change Order .... $ 1,152.00 <br />"the new (Contract Sum) (Guaranteed Maximum Coot including this Change Order .+i1I be ... 310,122.00 <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Bate of Substantial Completion as of the date of this Change Order therefore Is <br />•ndtan River Ca <br />Approved <br />Date <br />Artmin. <br />' yp <br />,uJ/5,/ 4 <br />, i •. n!t21 <br />k) . ( <br />tot/741_ <br />/0/0/0 <br />io/l7/0 <br />1 ..".1, -flet <br />')ept. <br />Risk Mgr. <br />( ) Days. <br />Authr,ri,ed: <br />The M_asters Group Indian River County <br />eJ gin`S1. Indian `River Drive"vrj. 40 25th Street <br />nddnrti• i 1 Addres. <br />Ft. Pierce, Fi. 34982 Vero Beach, Fi. 32960 <br />11'Y <br />aro Egger Vice Chair - <br />DAN. t1A1110-2 -89. .man <br />••1K11 1.1:8 I11111i 1`. • .., . • • <br />W5'i.'.AVI.hV. I. IN 111 _u..a. <br />40 <br />r•7111 - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.