My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/2/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/2/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/16/2015 8:34:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/02/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F_ <br />JAN <br />BOOK <br />Recognizing the cost differential between contracting with a firm versus an <br />individual, I am of the opinion that value of retaining a firm exceeds the cost <br />differential. Considering that the four projects will be in progress at the <br />same time, I believe the total resources of Proctor Construction can more <br />effectively manage the projects. They are in a better position to deal with <br />the time demands of scheduling, inspections, documentation, etc. As such, <br />they are also in abetter position to anticipate and minimize problems normally <br />associated with projects of this nature, which could otherwise result in <br />increased construction expense in the form of change orders. <br />It is my recommendation that Commission approve Proctor Construction <br />Company and authorize staff to prepare a final contract. <br />Funding for the service will be provided each project account. <br />Chairman Eggert asked what percentages of the cost would be <br />allocated to each of the projects, especially for the two <br />libraries where they have sweated blood over the budgets. <br />Administrator Chandler advised that 39.8% would be charged <br />to Phase III of the Jail; 24.4% to the Health Dept. Building; <br />24.5% to the Main Library; and 11.3% to the North Library. <br />Commi ssi-one-r---B_ir-d-was-pI eased to see the recommendation was <br />for a local contractor who has an excellent reputation. While he <br />was sure this contractor will do a fine job for the County in <br />looking after these projects, it still went a little bit against <br />the grain, after paying an architect and a general contractor, to <br />have to go pay a watchdog to see that we are getting what we are <br />supposed to get. <br />Commissioner Wheeler pointed out that Martin County hired a <br />construction management firm for $420,000 for their new <br />courthouse/administrative buildings and they shout up and down <br />that they have saved more than they have spent by the lack of <br />problems, better material, better bidding, etc. In fact, they <br />feel they saved that much right up front. <br />42 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.