Laserfiche WebLink
CONCEPT C TOTAL: $14,674,511.00 <br />JUDICIAL BUILDING <br />Site Utility Development (estimate) <br />Testing/Soils, Materials, Installations (estimate) <br />Furnishings and Equipment at $9.20 sq. ft. (58,857 sq. ft.) <br />Telephone/Communications Systems (allowance) <br />Landscape Improvements at $1.25/sq. ft. <br />Construction Costs at $96.00/sq. ft. (58,857 sq.ft.) <br />Construction Costs of "Shell" at $60.18/sq.ft. (28,544 sq.ft.) <br />Subtotal <br />5% Contingency - <br />Total <br />DESIGN FEES AT 10% OF CONSTRUCTION COSTS <br />RENOVATION OF EXISTING ANNEX <br />14,746 sq. ft. at $42.00/sq. ft. <br />Site Improvements: Landscape, Walkways, Graphics, etc. <br />Subtotal <br />5% Contingency <br />Total <br />DEMOLITION OF COURTHOUSE WINGS <br />LAND ACQUISITION <br />Block 30; Lots 10-14 <br />Block 36 (All But Lots 6,7,8 &9) <br />Block 44 <br />Subtotal <br />35% Contingency <br />Total <br />SURFACE PARKING AT $1,750.00/SPACE <br />446 Spaces (350 sq. ft./space) <br />Landscaping: 15% of Area at $2.50/sq. ft. <br />Subtotal <br />5% Contingency <br />Total <br />GREEN SPACE: 34,800 SQ.FT. AT $1.25/SQ.FT <br />IMPACT FEES <br />800 78 P,{IA SSU <br />$100,000.00 <br />30,000.00 <br />541,484.00 <br />200,000.00 <br />110,819.00 <br />5,650,272.00 <br />8,350,353.00 <br />417.518.00 <br />$8,7679871.00 <br />$876,787.00 <br />$619,332.00 <br />31.000.00 <br />650,332.00 <br />.32.517.00 <br />$682,849.00 <br />$36,000.00 <br />$195,250.00 <br />1,130,712.00 <br />831.137.00 <br />2,157,099.00 <br />754.985.00 <br />$2,912,084.00 <br />$780,500.00 <br />58.537.OQ <br />839,037.00 <br />41,951.00 <br />$880,988.00 <br />$43,500.00 <br />Traffic: 87,401 sq. ft. at $5,799.00/1,000 sq. ft. $506,839.00 <br />Credit for Building Space Removed from Service -155,100.00 <br />Water: 1 1/2" Meter at $5,082.00 plus $304.00 Connection Fee 5,386.00 <br />Sewer: 60 Fixtures at $212.00/6 Fixtures 2,120.00 <br />Total $359,245.00 <br />BUILDING PERMIT FEE <br />New Building $9,105.00 <br />Renovations 1.020 00 <br />Total $10,125.00 <br />PLAN EXAMINERS FEE AT 1/2 BUILDING PERMIT FEE $5,062.00 <br />OFF-SITE ROADWAY IMPROVEMENTS $100,000.00 <br />13 <br />