My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/23/1990
CBCC
>
Meetings
>
1990's
>
1990
>
1/23/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:43 PM
Creation date
6/5/2015 12:50:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/23/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement with Buildex, Inc., to construct certain <br />improvements to real property and Agreement with <br />Trodglen Paving, Inc. for off-site improvements to the <br />43rd Ave. Park West Office Complex and authorized the <br />signature of the Chairman. <br />SAID AGREEMENTS ARE ON FILE IN THE OFFICE OF CLERK TO THE BOARD. <br />ASSESSMENT PROJECT (WATER) - 23RD 8 25TH AVES., NORTH OF 8TH ST. <br />Utilities Director Pinto reviewed the following: <br />DATE: <br />TO: <br />FROM: <br />SUBJECT: <br />PREPARED AND STAFFED BY: <br />BACKGROUND <br />JANUARY 9, 1990 <br />JAMES E. CHANDLER <br />COUNTY, ADMINISTRATOR <br />TERRANCE G. PINTO <br />DIRECTOR OF UTILI Y SERVICES <br />PETITION ASSESSMENT PROJECT FOR 23RD AND <br />25TH AVENUES, NORTH OF 8TH STREET <br />WILLIAM F. McCAIN <br />CAPITAL PROJECTS R <br />DEPARTMENT OF UTIL TY SERVICES <br />We have received petitions for water service for both 23rd and 25th <br />Avenues, north of 8th Street. We now wish to proceed with the <br />design of a water distribution system to service these two avenues. <br />ANALYSIS <br />The project consists of the extension of a 12" water main on the <br />south side of 8th Street for approximately 200 feet, going east to <br />west. The project will also require a 6" line to be installed on <br />both 23rd and 25th Avenues, for the entire length of the avenues. <br />We are proposing to do the engineering design, permitting and <br />inspection within the County Utilities staff in order to reduce <br />costs by not utilizing outside consultants. The funds for this <br />project will temporarily come from the impact fee fund, ultimately <br />to be reimbursed by an assessment to the benefited property owners. <br />A complete cost estimate for the entire project will be brought to <br />the Board of County Commissioners during the assessment resolution <br />process. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the above -listed action. <br />39 F= <br />
The URL can be used to link to this page
Your browser does not support the video tag.