Laserfiche WebLink
_ M M <br />Page 8 <br />February 19, 1990 <br />Project Needs <br />The second issue involves the overall land needs for the project <br />as they relate to the existing land use classifications. As <br />identified in the DRI, the proposed mall will occupy 73.8 acres; <br />peripheral commercial development will occupy 51.2 acres, and <br />wetland and stormwater detention lakes will occupy 26.5 acres. <br />Staff has concerns with the need for 77.7 acres for non -regional <br />mall activities., Since commercial designation and zoning is not <br />required for the wetland and stormwater area, that 26.5 acres <br />could be removed from the request without jeopardizing the <br />project. This would also guarantee a buffer between the <br />commercial and residential areas, provide greater assurance that <br />the wetland would be preserved and provide a natural limit for <br />future commercial expansion. The peripheral commercial <br />development request, however, has various implications for the <br />overall land use pattern of the area which must be addressed. <br />It is customary for regional malls to attract commercial uses <br />which complement the facility but are not required as part of the <br />larger facility. These may include but are not limited to auto <br />repair centers, multi -screen cinemas, restaurants, gas stations, <br />lodging facilities and office space. Since these are more or less <br />accessory to the main facility and not required, staff is <br />concerned with the request and justification for 51.2 acres for <br />such uses. The future land use needs analysis of the <br />comprehensive plan indicates that the supply of commercial land <br />exceeds the projected need over the planning period. Therefore, <br />justification is needed for the additional commercial designation. <br />A brief review of the project master plan indicates that the mall <br />is to be located along the western edge of the property and set <br />back approximately 500 feet from SR 60. This configuration <br />results in approximately 18 acres of proposed peripheral commer- <br />cial located west of the easternmost mall entrance and the remain- <br />ing 33 acres located east of the mall site, including approxi- <br />mately 3 acres north of the wetland area and thus physically <br />separated from the main area of the site. Despite the relatively <br />large amount of land designated for peripheral commercial uses <br />(51.2 acres), these uses are tied to the regional mall in a manner <br />that would make their development unlikely in the absence of the <br />mall. In addition, one of the advantages of the DRI process is <br />that the Development Order may address the timing of the various <br />facilities and require phasing to ensure that the peripheral <br />commercial is not developed in the absence of the mall. <br />Relationship with Existing Development <br />The third issue is the relationship of the proposed mall with the <br />existing development pattern of the county. Large facilities such <br />as the one proposed must be located in proximity to the population <br />they serve. As the county continues to grow, development has no <br />choice but to move west. This pattern is evidenced by the growth <br />that has occurred along the SR 60 corridor, including several of <br />the largest residential developments in the county. The site is <br />also in close proximity to Vero Beach and the southern area of the <br />county which contains the highest portion of the county <br />population. The area is also directly linked to the Sebastian <br />area by 58th and 66th Avenues. This location in close proximity <br />to the county population center could result in shorter trip <br />lengths - a transportation planning objective. <br />Impact on Surrounding Land Uses <br />The fourth issue is the impact on area land use patterns. It is <br />likely that a facility such as proposed would act as a catalyst <br />for additional development in the vicinity. With the county's <br />nodal approach, however, future commercial development would have <br />to occur only in established nodes. <br />47 <br />FEB 2 71990 BOOK 1 F, t 395 <br />