Laserfiche WebLink
FEB 2 71990 <br />I <br />BOOK i PAGE <br />Chairman Eggert believed they have had two similar events <br />without any problem; the only difference is the request to use <br />the generator. <br />Director Davis advised that we have not required insurance <br />for this type of activity in the past. <br />ON MOTION by Commissioner Scurlock, SECONDED by Com- <br />missioner Wheeler, the Board unanimously (4-0) gave <br />permission for "Teens Against Boredom" to have a <br />beach party at Golden Sands Park as described above. <br />ASSESSMENTS ON A1A NORTH OF POLO CLUB TO McLARTY MUSEUM <br />DATE: <br />Director Pinto made the following presentation: <br />FEBRUARY 16, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PIN 0 <br />DIRECTOR OF UTI ERVICES <br />SUBJECT: ASSESSMENT ON A -1-A NORTH OF WINDSOR POLO <br />CLUB AND RELATED ENGINEERING SERVICES <br />IRC PROJECT NO. UW -89 -09 -DS <br />PREPARED AND STAFFED BY: HARRY E. ASHER AND STAFF <br />ASSISTANT DIRECTOR OF UTI ITY SERVICES <br />DEPARTMENT OF UTILITY SERVICES <br />BACKGROUND <br />The Department of Utility Services has received numerous inquiries <br />concerning water availability north of the Windsor Polo Club since <br />the construction of a 12" water main on A -1-A by Windsor Polo Club. <br />The Department has received direction from the County's <br />Environmental Control Officer as to the necessity of providing <br />public water on A -1-A due to salinity problems with the shallow <br />aquifer and well failures. The proposed project would serve the <br />houses on A -1-A and several side streets north of the Polo Club with <br />drinking water and fire protection from our North Beach Water Plant. <br />ANALYSIS <br />The Department has received petitions from lot owners on several <br />streets north of Windsor Polo Club, which will be included in this <br />project. Due to the risk to public health, the Department is <br />proposing this project to the Board of County Commissioners, and it <br />will be treated as an assessment. The preliminary construction cost <br />estimate for this project is $613,000.00. The associated <br />engineering costs, if performed by an outside consultant firm, are <br />estimated at approximately $40,000.00 for engineering fees and <br />$17,000.00 for inspection fees. <br />70 <br />