My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/6/1990
CBCC
>
Meetings
>
1990's
>
1990
>
3/6/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:44 PM
Creation date
6/16/2015 8:51:33 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/06/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />(Instructions on reverse side) No 1 <br />PROJECT: Miscellaneous Intersections DATE OF ISSUANCE: February 6, 1990 <br />Phase III -A <br />OWNER: Indian River County <br />(Name. 1840 25th St. <br />Address) Vero Beach, FL 32960 <br />CONTRACTOR: Dennis L. Smith, Inc. OWNER's Project No. 8906 <br />P.O. Box 2954 <br />Vero Beach, FL 32961-2954 ENGINEER: Kimball/Lloyd & Associates, Inc. <br />P.O. Box 650369 <br />CONTRACT FOR: Intersection Improvements Vero Beach, FL 32965-0369 <br />at 8th St. & 43rd Ave. S 8th St. 8 <br />20th Ave. ENGINEER's Project No. 87-656 <br />You arc directed to make the following changes in the Contract Documents <br />Description: ' See Attachment <br />Purpose of Change Order. See Attachment <br />Attachments: (List documents supporting change) <br />CHANGE IN CONTRACT PRICE: <br />Original Contract Price <br />S 213.683.51 <br />CHANGE IN CONTRACT TIME: <br />Original Contract Time <br />days es dm <br />Previous Change Orders No. to No. <br />S <br />Net cha ge from previous Change O ars <br />d+y <br />Contract Price prior to this Change Order <br />f 213,683.51 <br />Contract Time Pn r to this hange Order <br />da" ar dm <br />Net Increase (Bawasc) of this Change Order <br />s 6,420.00 <br />Net Increase (de c ase) of ' Change Order <br />dm <br />Contract Price with all approved Change Orders <br />$ 220,103.51 <br />Contract ime whh a8 approved Chang Orders <br />_ —= <br />ear.erama <br />RECOMM ED:.APPROVED: APPROVED: <br />dry - i, P.E. o.a. Cem,.eer <br />E)CDC No. 1910 &B (1`983 Edition) to - 9v <br />Prepared by the Engineer• Jed" Contrera Daeumeets Conu d"m act endorsed by The Associated Central Contractor orAnxrkc <br />ATTACHMENT TO CHANGE N0. 1 <br />8th Street and 43rd Avenue <br />Delete 80 L.F. of 18" R.C.P. <br />Add 80 L.F. of 12" x 18" Oval R.C.P. <br />Delete 29" x 45" R.C.P. and Replace with <br />24" x 38" Oval R.C.P. <br />Add 40 L.F. of 4" P.V.C. <br />Add 1 Concrete Mitered End Wall <br />Add Modify Catch Basin <br />Add 30 L.F. of 12" B.C.C.M.P. Under Sidewalk <br />8th Street and 20th Avenue <br />Add Tie Existing 18" B.C.C.M.P. into <br />60" R.C.P. Culvert <br />Add Remove 90 L.P. of Existing 18" C.M.P. <br />and Dispose of. Replace w/ 18" R.C.Y. and <br />Tie into 60" R.C.P. Culvert <br />/99� <br />AC?r,•: cd ta•c <br />i Adrnlrt <br />8udgc1 <br />, f, <br />Eng <br />Aish Mgr. <br />MAR 6 1990 51 <br />(-) $4,000.00 <br />(+) $4,600.00 <br />(+) $ 500.00 <br />(+) $ 320.00 <br />(+) $ 50.00 <br />(+) $ 200.00 <br />(+) $ 600.00 <br />(+) $ 500.00 <br />(+) $3,650.00 <br />ROOK 1 F'„UE 8J <br />
The URL can be used to link to this page
Your browser does not support the video tag.