My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/13/1990
CBCC
>
Meetings
>
1990's
>
1990
>
3/13/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:44 PM
Creation date
6/16/2015 8:52:18 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/13/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 131990 <br />Aocir. <br />LEMUEL RAMOS*& ASSOCIATES. INC. <br />ARCHITECTS/ PLANNICRS/ INTERIOR DESIGNERS <br />(305)666--2884 7426 S.W. 48th Street, Miami. FL 33'155 <br />VACSIMILE TRANSMITTAL COVER S.iEE'r <br />1 9 �'�1.uC 5 4 j <br />Our rax a: <br />(305)G66' -02a8 <br />------------..------- - - - - - - -- <br />DATE: <br />- <br />DATE: �L7 D . <br />DELIVER TO:L.- <br />ATTN: esG [�! M �i � - 1�}• PHONE: <br />THIS FACSIMILE IS BEING SENT BY: �..+��,.�/-or� r <br />THIS IS NOT AN ADDENDUM -JUST CLARYFYCATIONS <br />ADDITIVE ALTERNATES TO THE INDIAN RIVER COUNTY PUBLIC HEALTH UNIT <br />ALTERNATE NO. 1: <br />Provide Exterior Quary Tile.Terrace on Second Floor Level between <br />axis D and H, and 1 and'31 Refer to Section 09312. <br />ALTERNATE NO. 2:. - <br />Provide Emergency generator System'as shown on electrical plans. <br />ALTERNATE NO. 3: <br />Provide Singly Ply Flexible Sheet Roofing System (PVC) <br />Fully Adhered in^lieu-of Built -Up Asphalt Roofing System, <br />Refer to Sections 07200/07531, <br />ALTERNATE NO. 4: <br />General Contractor to prdvide•the basie.automatic DDC control <br />System as indicated on drawing M--5. <br />ALTERNATE NO S: <br />General Contractor to provide the equipment additions to DDC <br />control system as indicated on Drawing M -5. - <br />GENERAL CLARXrjCATZON:"" " <br />General. Contractor is responsible for all sitework and roadwork shown <br />on Civil drawings, Sheets C-1 thru C-3. The City is responsible for all <br />paving of 19th Avenue from 26th Street to 27th Street and all work in this <br />area except.the 12" dia. CAP and catch basins at 19th Avenue and on 27th <br />Street (as noted on sheet C -2j. The small Culvert on 19th Avenue is to <br />be constructed by the General Contractor. <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.