Laserfiche WebLink
contacted the University of Florida to see if a senior <br />landscape architect student would develop a master plan as a <br />senior project, however, this approach was later abandoned. <br />On August 22, 1985, the committee was informed that the <br />Indian River County Farm Bureau had funds to construct a <br />building at the fairgrounds. To plan for this building, the <br />Board entered into a consulting services agreement on <br />January 6, 1987 with Mayes, Suddereth, and Etheredge, Inc. <br />to develop a Fairgrounds Master Plan. On August 22, 1988, <br />the Fairgrounds Committee approved with revisions, the <br />Fairgrounds Master Plan, and in September 1988, the Board of <br />County Commissioners approved the Master Plan. Included in <br />the approved Master Plan was an area for a building to <br />accommodate livestock/agricultural area. <br />With the Master Plan now complete, the Farm Bureau <br />would like to proceed with constructing a permanent metal <br />open -sided 31,850 s.f. building to accommodate multi -use <br />activities. A roofed, open -sided building with an <br />earth/aggregate floor and bleachers seating 3,500 persons is <br />proposed. Once constructed, the Farm Bureau would donate <br />the building to the county, with the Farm Bureau, 4-H Club, <br />and Steer Show having priority to use the facility for <br />10-15 events yearly. The Farm Bureau has approximately <br />$60,000.00 to construct the building, however, the following <br />items are being requested to be supplied by the county: <br />In -Rind <br />Cost by <br />County Road <br />& Bridge Div. <br />1) Clearing and grubbing of the site <br />(approx. 5 acres north of the existing <br />cleared portion of the Fairground site) _ $ 25,000 <br />2) Fill/Grading/Grassing <br />Direct Costs <br />Requiring <br />Appropriation <br />of Funds <br />Fill 50,000 sf x 3' = 5,500 cy @$4/cy 22,000 <br />27 cf/cy <br />Grading 24,000 sy @ $.50 12,000 <br />Grassing 20,000 sy @ $.50 = 10,000.00 <br />Subgrade Preparation <br />2000 sy @ $1.50/sy = 2,500 2,000.00 <br />Traffic Impact Fee 13,154.05 <br />Building Permit Fee 354.75 <br />Tree Removal/Land Clearing/ <br />Site Plan Fee = 730.00 <br />SJRWMD Permit Fee = 250.00 <br />Connection to existing Well = 2,000.00 <br />Access Road Construction = 4,500.00 <br />Solid Waste Disposal Fee - 0. <br />Landfill Fees - 3,000.00 <br />FPL Electric Service = 300.00 <br />Estimated Cost $ 61,500 $ 36,288.80 <br />BOOK� <br />fi�4 <br />APR 3 1990 43 <br />� � J <br />