My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/17/2013AP
CBCC
>
Meetings
>
2010's
>
2013
>
09/17/2013AP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 2:35:55 PM
Creation date
3/23/2016 9:01:57 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/17/2013
Meeting Body
Board of County Commissioners
Book and Page
193
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000G\S0004NM.tif
SmeadsoftID
14227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Final Payment to MPI for Rockridge Work Orders <br /> BCC Meeting — September 17, 2013 — CONSENT <br /> September 9, 2013 <br /> permitting. MPI recently met its contractual obligations with respect to its various Work <br /> Orders with the County. MPI's final task was complete in August 2013 when the U.S. <br /> Army Corps of Engineers issued a permit to mitigate environmental damage. <br /> Part of MPI's work included preparation of an Engineer's Opinion of Probable <br /> Construction Cost. MPI's final cost estimate, based on its final design drawings, is <br /> $7,213,000 which is considerably higher than the original $2,000,000 engineering and <br /> construction cost estimate provided by PBSJ in 2006. The Rockridge Subdivision <br /> Surge Protection Project is not funded in the current five-year Capital Improvement <br /> Plan. Originally, FEMA promised to reimburse a Phase 2 construction grant on a 75-25 <br /> percentage basis, with 75 percent of the costs paid by FEMA. However, now FEMA <br /> does not have enough funding for a 75-25 split. FEMA can now only reimburse <br /> $3,148,642 of the estimated $7,213,000 construction cost, which equals 43.65 percent. <br /> If a Phase 2 grant were issued for construction, the County must front all of the cost and <br /> would be reimbursed by FEMA only upon completion of the project and approval of all <br /> work by FEMA. Note that before FEMA will approve a Phase 2 construction grant, a <br /> benefit-cost analysis must be performed to determine if the project is still cost effective. <br /> The new benefit-cost analysis is being calculated by a DCA engineer and the results are <br /> not known yet. The original benefit-cost ratio was 2.45. To qualify for Phase 2 <br /> construction funding the ratio must be 1.00 or greater. <br /> ANALYSIS <br /> Alternative No. 1 — Approve release of retainage for MPI Work Orders No. 3-RR, 4-RR, <br /> and 5-RR. <br /> Alternative No. 2 — Reject release of retainage for MPI Work Orders No. 3-RR, 4-RR, <br /> and 5-RR. <br /> FUNDING <br /> The total $50,073.59 retainage for the Rockridge Surge Protection Project will come <br /> from Account #315-20600-06046, Optional Sales Tax /Retainage/Malcolm Pirnie. A <br /> breakdown of the retainage amount for each subject Work Order follows: <br /> • Work Order No. 3-RR = $35,352.70 <br /> • Work Order No. 4-RR = $ 9,865.29 <br /> • Work Order No. 5-RR = $ 4,855.60 <br /> Total = $50,073.59 <br /> FAPublic Works\KeithM\Stormwater Projects\Rockridge Subdivision\Agenda Items\Agenda Item-Final Payment to MPI-Arcadis.doc 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.