My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/14/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/14/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 11:34:18 AM
Creation date
3/23/2016 9:20:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/14/2014
Meeting Body
Board of County Commissioners
Book and Page
160
Subject
Impact Fees
Part II October 14 Agenda Pk
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000L\S00060D.tif
SmeadsoftID
14733
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Other Required Roadway Improvements: The approved traffic impact analysis indicates <br />that the following site related traffic improvements are required: <br />a) An east bound right -turn lane is required on SR 60 at the project driveway. The <br />right -turn lane must be constructed prior to the issuance of the first certificate of <br />occupancy in phase I. <br />b) A west bound right -turn lane is required on College Lane at the project driveway. <br />The right -turn lane must be constructed prior to the issuance of the first certificate <br />of occupancy in phase I. <br />External Sidewalks: A 5' wide sidewalk is required along the site's College Lane <br />frontage, and the applicant is proposing to build other off-site sidewalks on the north side of <br />College Lane to the east of the subject site. That off-site work will result in a continuous <br />sidewalk segment from the subject site to the north/south sidewalk on 58th Avenue. There <br />is an existing sidewalk along the subject site's SR 60 frontage that will be maintained <br />through the course of project construction. <br />Internal Pedestrian System: The development will have an internal sidewalk system that <br />will link all of the uses and provide pedestrian access within the project for residents and <br />commercial customers. That system will connect commercial and multi -family buildings to <br />other buildings and to sidewalks at project entrances. In addition, the internal pedestrian <br />system will be connected to the external pedestrian system along College Lane, SR 60, the <br />SR 60 transit stop and shelter, and to Century Town Center. <br />14. Stormwater Management: The preliminary stormwater plan proposes multiple dry detention <br />areas and a single stormwater treatment pond that outfalls to a canal on the south side of SR 60. <br />The preliminary plan has been approved by Public Works. Prior to release of the preliminary PD <br />plan, the applicant will be required to submit detailed plans and obtain a Type "B" stormwater <br />permit. <br />15. Utilities: The entire development will be served by county water and sewer. Those utility <br />provisions are consistent with applicable LDRs, and have been approved by the Department of <br />Utility Services and the Health Department. The developer will need to obtain a land development <br />permit or waiver and utility permits prior to construction of the each phase. <br />16. Concurrency: As required under the county's concurrency regulations, the applicant has applied for <br />and obtained a conditional concurrency certificate for the project. The concurrency certificate was <br />issued based upon a concurrency analysis and a determination that adequate capacity was available to <br />serve this project at the time of the determination. Prior to issuance of a building permit, the <br />developer will be required to obtain a final concurrency certificate in accordance with county <br />concurrency regulations. <br />17. Environmental Issues: <br />• Uplands: Since the site is over 5 acres, the native upland set aside criteria of section 929.05 <br />apply. In this instance, the subject site was approved in 2005 for a residential development and <br />the site was cleared consistent with the approved project design and upland set aside area for <br />F:\Community Development\CurDev\BCC\2014 BCC\Thereserveatverobeach(PD-14-06-04).doc <br />9 <br />174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.