My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/14/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/14/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 11:34:18 AM
Creation date
3/23/2016 9:20:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/14/2014
Meeting Body
Board of County Commissioners
Book and Page
160
Subject
Impact Fees
Part II October 14 Agenda Pk
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000L\S00060D.tif
SmeadsoftID
14733
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Along the east property line, where the commercial lot is proposed adjacent to the existing Olive <br />Garden site, a 10' wide local road landscape strip is proposed. The remainder of the east property <br />line, where the multi -family is proposed adjacent to the Century Town Center, a 25' wide Type "B" <br />buffer is proposed. In addition, the plan adequately addresses interior landscape requirements such <br />as lakeshore trees around the project's stormwater pond, street trees, parking lot landscaping, and <br />common area landscaping. <br />11. Parking: <br />Required Proposed <br />Lot 1 Restaurant 84 126 <br />Lot 2 Retail 36 38 <br />Lot 3 Restaurant 65 75 <br />Multi -Family 318 342 <br />Total 503 581 <br />Note: For the multi -family development, 32 of the proposed spaces are proposed as <br />garage spaces. <br />12. Traffic Circulation: The conceptual PD plan provides two driveways to public streets and a <br />driveway inter -connection with the commercial property to the east. There is a 26' wide two-way <br />driveway proposed on SR 60, which will allow right-in/right-out movement. The SR 60 driveway <br />will be served by an east bound right -turn lane. A median divided driveway is proposed to College <br />Lane with 14' wide in bound and out bound lanes. The College Lane driveway is a full movement <br />driveway and will be served by a west bound right -turn lane. A 25' two-way driveway connection <br />is proposed to connect to the commercial parcel to the east. The driveway connection is located <br />south of proposed commercial parcel #3 and the Olive Garden. That connection will tie into a <br />driveway stub -out constructed during development of Century Town Center. <br />As proposed, the project's commercial uses and residential uses will be inter -connected via a main <br />north/south driveway (connects to SR 60) and an east -west driveway (connects to Century Town <br />Center). No part of the development is proposed to be gated. <br />The driveway designs and locations, internal circulation plan, project traffic study, and proposed <br />off-site improvements have been approved by Traffic Engineering and Fire Prevention. <br />To address the PZC's recommendation regarding the project's impact on the SR60/58th Avenue <br />intersection, the approved project driveway trip assignment sketch has been attached to this report <br />(attachment #4). In addition, planning staff has re -confirmed with Traffic Engineering that, based <br />on the County's traffic impact study requirements and data provided in the approved traffic study, <br />an intersection analysis for the SR60/58th Avenue intersection is not required (see attachment #4, <br />table 2). Also, Traffic Engineering re -confirmed that the northbound to westbound left turning <br />movement at the SR60/58th Avenue intersection should be relieved to some degree by recent <br />improvements to 66th Avenue, and that access to the project site from College Lane is a logical <br />alternative for northbound traffic on 58th Avenue. <br />13. Dedications and Improvements: <br />Transit stop: The applicant has coordinated with MPO staff and is providing a transit stop <br />and shelter at an approved location along the site's SR 60 frontage. In addition, sidewalk <br />improvements are proposed along the site's SR 60 frontage and within the project so as to <br />provide convenient pedestrian access between the commercial and residential uses within <br />the project and the proposed SR 60 transit stop and shelter. <br />F:\Community Development\CurDev\BCC\2014 BCC\Thereserveatverobeach(PD-14-06-04).doc 8 <br />173 <br />
The URL can be used to link to this page
Your browser does not support the video tag.