My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEGMENT 2 BUILD ALTERNATIVE <br />L. <br />63' Proposed R/W <br />63' Proposed R/W <br />10' E 53' Existing R/W 53' Existing R/W 10' <br />4' 6' 4' 12' 12' 12' 11' 1 11' 12' 12' 12' 4' ' 6' 4' <br />r1"1" T Tr <br />r„, <br />BUILD ALTERNATIVE 1 Wide in9 Widening <br />• Widening the road from 4 to 6 lanes • This alternative needs an additional 10 feet of <br />• Maintaining the speed limit at 45 mph right-of-way on each side of the roadway <br />• The total amount of right-of-way needed is 20 feet <br />What to expect at the Meeting <br />Project information and graphics depicting each of the alternatives <br />being considered will be on display and members of the project team <br />will be available to answer your questions and receive your input. <br />This will be an excellent opportunity to learn more about the project, <br />the alternatives being considered, and what the project could mean <br />for your community as it relates to traffic, noise, and access to your <br />community facilities. Information will be presented in an open house <br />format. You will be able to <br />make comments and have <br />them become a part of this <br />study. We value your <br />feedback and we want to <br />hear from you. If you can't <br />make it to the meeting, other <br />ways of contacting the <br />project team can be found <br />on the back of this <br />newsletter on page 4. <br />STUDY SCHEDULE: <br />Contact Information. <br />FDOT Project Manager <br />Anson Sonnett, P.E. <br />3400 W. Commercial Boulevard <br />Fort Lauderdale, FL 33309 <br />(866) 336-8435 ext. 4474 <br />anson.sonnett@dot.state.fl.us <br />Consultant Project Manager <br />Aniruddha "Rudy" Gotmare, P.E. <br />(561) 429-5065 <br />agotmare@scalarinc.net <br />Project Website <br />www.us 1 study.com <br />The information presented at the Alternatives Public <br />Meeting will also be available on the project website <br />following the meeting. <br />Comments can be made on the website by clicking on the <br />link "Email Updates" on the left side of the webpage. 3 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.