My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/07/2014
Meeting Body
Board of County Commissioners
Book and Page
452
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005AQ.tif
SmeadsoftID
14458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Prior to or via the final plat process, the applicant shall establish conservation <br />easements over existing native upland and wetland areas, as shown on the conceptual <br />PD plan. <br />6. Via the final plats for the portions of the project that are adjacent to 33rd Street and 58th <br />Avenue, the applicant shall dedicate drainage easements to the County to <br />accommodate stormwater run-off treatment for improvements to 33rd Street and 58th <br />Avenue. <br />7. The Harmony Reserve project site shall revert to its original RS -3 zoning if project <br />construction has not commenced within 7 years of the date of the conceptual PD plan <br />and PD rezoning approval. <br />8. Lots on the project perimeter shall be restricted to one story homes. <br />9. Via the PD final plat process, the Harmony Reserve re -plats that affect any portion of <br />Albrecht Acres shall be structured so as not to eliminate or interfere with any of the <br />rights afforded by the Albrecht Acres plat that provide for access and services to the <br />enclave parcels. <br />10. The site shall be cleared on a phase by phase basis and the developer shall obtain a <br />separate land clearing and tree removal permit for each phase and associated land <br />development permit, prior to clearing. <br />11. Heavy construction traffic using 37th Street shall be limited to access from the west <br />(66th Avenue). <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Approved Minutes from the August 14th & 28th, 2014 PZC Meetings <br />4. Rezoning Ordinance <br />5. Traffic Summary <br />6. Section 915.13(5) PD Design Guidelines & Conceptual Architectural Elevations <br />7. 55+ Community State Program Criteria <br />8. Conceptual Color Renderings <br />9. Conceptual PD Plan, Landscape Plan with Aerial Sections, and Aerial <br />APPROVED AGENDA ITEM: <br />FOR: October 7, 2014 <br />BY: <br />Indian River Co, <br />Approved <br />Date <br />Admin. <br />1��� <br />)lef / <br />Legal <br />0.-�(- <br />rt. 1 <br />Budget <br />, <br />` 14 <br />Dept. <br />`i <br />2,g/it/ <br />Risk Mgr. <br />- <br />. <br />F:\Community Development\CurDev\BCC\2014 BCC\HarmonyReservePD-14-06-05ConcepRpt.rtf <br />15 <br />146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.