My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/07/2014
Meeting Body
Board of County Commissioners
Book and Page
452
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005AQ.tif
SmeadsoftID
14458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />Subsurface Utility Engineering Services <br />Designating Services <br />Project Manager <br />Senior Technician <br />2 man crew <br />3 man crew <br />Vacuum Excavation <br />Test Holes <br />1 Test Hole/Dirt <br />1 Test Hole/Asphalt/Concrete <br />2 - 19 Test Holes/Dirt <br />2 - 19 Test Holes/Asphalt/Concrete <br />20 - 49 Test Holes/dirt <br />20 - 49 Test Holes/asphalt/concrete <br />50 - 99 Test Holes/dirt <br />50 - 99 Test Holes/asphalt/concrete <br />100 or more Test Holes/dirt <br />100 or more Test Holes/asphalt/concrete <br />GPR Bore Route <br />Vacuum Excavation for Environmental Services <br />Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand di <br />10 feet prior to drilling. (3"-4" in diameter, 8' to 10' deep, concrete/asphalt removed if necessary) <br />1 - 9 Monitoring Wells/Soil Samples <br />10 - 19 Monitoring Wells/Soil Samples <br />20 - 49 Monitoring Wells/Soil Samples <br />Utility Clearing - Using Ground Penetrating Radar <br />as well as Conventional Electronic Line Locators <br />An hourly rate of $285.00 will be used for all exploratory excavation projects. <br />Larger excavation projects which require specialized equipment (shoring, de -watering, etc.) will be <br />task basis. <br />Utility Coordination Services <br />Senior Utility Coordinator <br />Utility Coordinator <br />CAD Technician <br />Survey Services for Utility Projects <br />Project Manager/Professional Surveyor and Mapper <br />Two Person Survey Field Team <br />Three Person Survey Field Team <br />Clerical <br />Concrete Radar Mapping/Imaging <br />(concrete assessment/inspection, grid scans, density & debris assessment) <br />1 Man Crew <br />Closed Circuit Televising (CCTV) Services <br />Maintenance of Traffic (MOT) <br />If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of <br />same <br />SSMC MOT Lane Closures <br />$115.00 / per hour <br />$85.00 / per hour <br />$185.00 / per hour <br />$205.00 / per hour <br />$410.00 <br />$510.00 <br />$350.00 / each <br />$400.00 / each <br />$320.00 / each <br />$360.00 / each <br />$275.00 /each <br />$320.00 / each <br />$245.00 / each <br />$280.00 / each <br />$500.00 / each <br />gging down 8 feet to <br />$250.00 / each <br />$200.00 / each <br />$150.00 / each <br />$115.00 / per hour <br />quoted on a task by <br />$115.00 / per hour <br />$85.00 / per hour <br />$75.00 / per hour <br />$115.00 / per hour <br />$115.00 / per hour <br />$145.00 / per hour <br />$50.00 / per hour <br />$115.00 / per hour <br />$115.00 / per hour <br />Per Lane Closure <br />Per Lane Closure <br />Gary B. Krick, PSM / President <br />Date:Zt-LP% 2.2,12.4)14P <br />$350.00 / per day <br />$500.00 / per night <br />50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.