My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/07/2014
Meeting Body
Board of County Commissioners
Book and Page
452
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005AQ.tif
SmeadsoftID
14458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: <br />THROUGH: <br />FROM: <br />SUBJECT: <br />DATE: <br />Joseph A. Baird, <br />County Administrator <br />Christopher R. Mora, P. <br />Public Works Director <br />James D. Gray, Jr. <br />Coastal Engineer <br />CONSENT AGEND <br />Work Order No. 7 CB&1 Coastal Planning and Engineering, Inc. <br />Sector 3 Dune Repair Project - Construction Phase Services <br />September 29, 2014 <br />DESCRIPTION AND CONDITIONS <br />On March 19, 2013 the Board approved a contract with CB&I Coastal Planning and Engineering, <br />Inc. (CB&I) for professional coastal engineering services in Indian River County for a two-year <br />term, 2013-2015. CB&I is the selected County consultant for professional engineering services <br />related to the Sector 3 Dune Repair Project. <br />The proposed Work Order No. 7 provides construction phase services for the Sector 3 Dune <br />Repair Project; anticipated project construction is November, 2014. <br />Work Order No. 7 totals a lump sum amount of $57,319. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue as well <br />as allocation of the One Cent Sales Tax. For FY 14/15, funding is budgeted and available for <br />construction of the Sector 3 Dune Repair Project in the Beach Restoration Fund, Sector 3 <br />Renourishment Post -Sandy Account No.12814472-066510-13014. <br />Work Order No. 7 has been reviewed by the Florida Department of Environmental Protection <br />(FDEP) and is eligible for cost sharing at a 50% state share, based on Legislative appropriation <br />under FDEP Grant 14IR2 between Indian River County and FDEP. <br />F:\Public Works\JamesG\Sector 3 Repair Project\CPE Work Orders\Work Order No. 7\Agenda Item\agenda item <br />Coastal Planning and Engineering Work Order No 7.docx <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.