My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/07/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
10/07/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 4:58:52 PM
Creation date
3/23/2016 9:08:36 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/07/2014
Meeting Body
Board of County Commissioners
Book and Page
452
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005AQ.tif
SmeadsoftID
14458
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CB&I will provide As -Built drawings and a completed As -Built Certification Form to the USACE. <br />The cost to develop the project completion report and develop project certification is $5,158. A <br />breakdown of the hours and expenses to develop these costs is attached and follow the terms of <br />CB&I's agreement with Indian River County. <br />Task 7: Check Surveys <br />It is recommended that the County conduct surveys at each of the FDEP monuments to check the <br />accuracy of the Contractor's surveys. This will be a separate Notice to Proceed Item, as the County will <br />likely have Morgan & Eklund perform the work. However, if Morgan & Eklund perform the more closely <br />spaced post -construction pay lines for the Contractor, then CB&I can perform this independent check <br />for the County. , The surveys will extend out to wading depth to fulfill the FDEP survey requirements. <br />CB&I will provide the County with a survey report performed to FDEP standards, which will also include <br />cross-sections showing the pre and post -construction profiles and the permitted template <br />The cost to perform and document check surveys is $11,646. A breakdown of the hours and expenses <br />to develop these costs is attached and follow the terms of CB&I's agreement with Indian River County. <br />Cost <br />The cost to provide construction phase services for Tasks 1 through 7 is $57,319 on a lump sum basis. <br />A breakdown of the hours and expenses to develop these costs is attached. All work will be performed <br />in accordance with the provisions of the Professional Coastal Engineering Services Agreement, dated <br />March 19, 2013, between Indian River County and Coastal Planning & Engineering, Inc., n/k/a CB&I <br />Coastal Planning & Engineering, Inc. <br />Timeline <br />Various tasks will be completed as discussed throughout the scope. A fixed timeline cannot be <br />provided because it is unclear when how the Contractor's construction schedule will be structured. <br />CB&I will attempt to execute each phase of the work in as expeditious a manner as possible. <br />We appreciate the opportunity to work with Indian River County on this effort and recognize the <br />importance of restoring the Sector 3 dune for the protection of upland property. <br />Please call me if you have any questions. <br />Sincerely, <br />Gordon Thomson, P.E., D.CE <br />Director <br />CB&I Coastal Planning & Engineering, Inc. <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.