My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/2014 (7)
CBCC
>
Meetings
>
2010's
>
2014
>
11/18/2014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 12:42:29 PM
Creation date
3/23/2016 8:53:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/18/2014
Meeting Body
Board of County Commissioners
Book and Page
410
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004AE.tif
SmeadsoftID
14159
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the County for Developer's share (37.5%) of the cc <br />construction of 53rd Street as a two lane road from <br />where the paved improvements described herein e <br />point which is 2,454 feet west of the project's east <br />line. <br />(5) The Developer's obligation with respect to 53`d <br />identified in this Developer's Agreement, shall be <br />satisfied so long as the Developer is in compliance <br />Agreement, and the County shall not withh <br />approval, permit, or concurrency certificate becau <br />condition of 53`d Street anywhere except adj <br />Providence Pointe, provided the Developer <br />compliance with this Agreement. <br />(6) The Developer shall receive traffic impact fee cred <br />design, engineering, permitting, and constructi <br />associated with the 53`d Street improvements c <br />herein paid or contributed by the Developer, ex <br />those costs associated with site related turn lanes <br />site related improvements; and any landscaping in <br />the landscaping required by County Ordinance. Tl <br />be considered "non -reimbursable costs". <br />4. 49th Street Improvements and Dedication: <br />A. Prior to the issuance of a Land Development P <br />Phase IA of Providence Pointe, the Developer shall: <br />(i) Dedicate to the County ten feet (10') of right -of -v <br />the project's 49th Street frontage from 58th Avenue W <br />distance of approximately 2,591 feet (the "Eastern Segm <br />Exhibit "B"; and <br />of the <br />point <br />to the <br />as <br />th this <br />1 any <br />of the <br />;nt to <br />is in <br />for all <br />costs <br />cribed <br />)t for: <br />other <br />;ess of <br />shall <br />for <br />along <br />for a <br />" 1 see <br />(ii) Dedicate to the County along the project's 49.. Street <br />frontage sixty feet (60') of right-of-way from the West erld of the <br />"Eastern Segment" to a point approximately 1,328 feet West (the <br />"Western Segment") see Exhibit "B". <br />B. Prior to the issuance of a certificate of completion for <br />Developer shall construct a two lane road for a di <br />approximately 3,260 feet from the existing paved roa <br />Street, which ends approximately 700 feet west of 58t1i A <br />western boundary of Providence Pointe, as shown <br />j:\brucc\clients\providence pointe-barite\developer's agreement clean 10.28.14.docx <br />0 <br />ase IB, <br />mce of <br />on 49cb <br />., to the <br />on the <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.