My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
12/17/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 4:15:40 PM
Creation date
3/23/2016 9:09:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Joint Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2014
Meeting Body
Board of County Commissioners
Town of Indian River Shores
Book and Page
140
Subject
Florida Governmental Conflict Resolution Process
Electric Rates
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005BI.tif
SmeadsoftID
14486
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMM B <br /> Page 2 of 3 <br /> Orlando Utltitles Commission Discusdan Points to <br /> Response to City of Vern Beach Request for Modifleatton to PPA <br /> Oder Z0,2014 <br /> Delivery Point for Capacity/Energy Same as in PPA currently for both Base Capacity and P <br /> Baking Capacity <br /> (OUGFPL inteMmmectlon). <br /> Conditions of OUC Otter 1) Vero to retire the Vero Power Plaut upon completion of any aPphcabb <br /> tranamisaion reliability upgrades,with the plant capacity removed from <br /> d w PPA as an available resource for Vero as of the Amendment <br /> EftWtIe Date. <br /> 2) OUC is to have a one-time option on or before 1-1-2024 to acquire the <br /> 411ts end obligations att'Vero's St Lucie Entitlement(13.5 MW) <br /> based on an agreed power purcahasc agremaw that is a cost pass, <br /> tlrrm9hprieing. Option would survive OUC early termination. <br /> 3) C urent natural gas transporttiou rights assigned to OUC would <br /> remain with OUC and would survive OUC early tarminatian. <br /> 4) Vero eball obtain network transmission service from FPL for Peaking <br /> Capacity from the Delivery Point to the bad. <br /> 5) OUC Bhall obtain firms traastuisaion service over the OUC transmission <br /> system for the Peaking Capacity to the Delivery Point <br /> 5) Subject to negotiation And agreement on definitive contrail terms and <br /> Cmroval <br /> by the Board of OUC and the City of Venn Bosch City � <br /> Page 2 <br /> 3� <br />
The URL can be used to link to this page
Your browser does not support the video tag.