My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/17/2014 (3)
CBCC
>
Meetings
>
2010's
>
2014
>
12/17/2014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 4:15:40 PM
Creation date
3/23/2016 9:09:39 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Joint Meeting
Document Type
Agenda Packet
Meeting Date
12/17/2014
Meeting Body
Board of County Commissioners
Town of Indian River Shores
Book and Page
140
Subject
Florida Governmental Conflict Resolution Process
Electric Rates
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000H\S0005BI.tif
SmeadsoftID
14486
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACffiENT C <br /> Page 2 0£ 3 <br /> Orlando Utilities Commission Discussion Points in <br /> Response to City of Vero Beach R"ned for Additional Options for MoMeation to PPA <br /> November 25,2014 <br /> Delivery Point for Capacity/Energy Same as in PPA currently for both Base Capacity sad Peaking Capacity <br /> (01)C-FPL interconnection). <br /> Conditions of OUC Offer 1) Vero to retire the Vero Power Plant upon completion of any applicable <br /> transmission reliability upgrades,with the plant capadtyrcmoved from <br /> the PPA as an available rrmurce for Vero as of the Amendment <br /> Effective Date. <br /> 2) Upon expirstiion of the PPA's,the natural gas iranaportation rights <br /> assigned to OUC would remain with OUC unless Vero builds gas-feed <br /> generation at the existitkg Vero Power Plant site by December 31,2024 <br /> to aervr;its native load,in which out Vero can request the natural gas <br /> transportation rights to be assigned back to Vero. <br /> 3) Veno shall obtain network transmission service from FPL for Peaking <br /> Capacity from the Delivery Point to the load <br /> 4) OUC shall obtain firm transmission service over the OUC tramm mwm <br /> system for the Peaking Capacity to tate Delivery Point. <br /> 5) Subject to negotiation and aVeement on definitive contract teras;and <br /> CVproval by the Board of OUC and the City of Vero Beach City <br /> �«- Page 2 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.