ATTACffiENT C <br /> Page 2 0£ 3 <br /> Orlando Utilities Commission Discussion Points in <br /> Response to City of Vero Beach R"ned for Additional Options for MoMeation to PPA <br /> November 25,2014 <br /> Delivery Point for Capacity/Energy Same as in PPA currently for both Base Capacity sad Peaking Capacity <br /> (01)C-FPL interconnection). <br /> Conditions of OUC Offer 1) Vero to retire the Vero Power Plant upon completion of any applicable <br /> transmission reliability upgrades,with the plant capadtyrcmoved from <br /> the PPA as an available rrmurce for Vero as of the Amendment <br /> Effective Date. <br /> 2) Upon expirstiion of the PPA's,the natural gas iranaportation rights <br /> assigned to OUC would remain with OUC unless Vero builds gas-feed <br /> generation at the existitkg Vero Power Plant site by December 31,2024 <br /> to aervr;its native load,in which out Vero can request the natural gas <br /> transportation rights to be assigned back to Vero. <br /> 3) Veno shall obtain network transmission service from FPL for Peaking <br /> Capacity from the Delivery Point to the load <br /> 4) OUC shall obtain firm transmission service over the OUC tramm mwm <br /> system for the Peaking Capacity to tate Delivery Point. <br /> 5) Subject to negotiation and aVeement on definitive contract teras;and <br /> CVproval by the Board of OUC and the City of Vero Beach City <br /> �«- Page 2 <br /> L <br />