Laserfiche WebLink
MH <br /> MASTEILLER. & MOLER, INC. <br /> —CIVIL ENGINEERS " <br /> December 30, 2013 <br /> Mr. Vincent Burke, PE - Director <br /> Indian River County Utilities Department <br /> 180127" Street <br /> Vero Beach, Florida 32960 <br /> RE: Indian River County Central WWTF Sludge Holding Tanks Modifications <br /> Review of Bids <br /> Indian River County, Florida <br /> Our File# 1305 <br /> IRC Project# UCP 4102/Bid No 2014006 <br /> Dear Mr. Burke: <br /> Bids were received for the referenced project and opened on December 18, 2013 at 2:00 p.m. The <br /> original bid packages are included with this letter. Three (3) qualified General Contractors submitted <br /> bids, which varied from a low of Six Hundred Fifty-Four Thousand Dollars ($654,000.00) to Seven <br /> Hundred Seven Thousand Dollars ($707,000.00). The Utility Department's budget and the Engineer's <br /> Estimate is Four Hundred Thousand Dollars ($400,000.00). A copy of the bid tabulation sheet is <br /> attached. The low bidder is R. J. Sullivan Corporation of Pompano Beach, Florida. <br /> I have reviewed each of the three (3) bids and find the information in all three (3) bids to be complete <br /> and in order. <br /> The bids are substantially over the amount which has been budgeted by the Utility Department, as <br /> well as our engineering estimate amount. The budget amount established for this project was done <br /> several years ago and our office made every effort in order to develop a project scope which would fit <br /> in to that budget amount. Prior to developing the final project scope, our office along with a local <br /> contractor and Utility Department Staff spent several months conducting site visits, meetings, and <br /> discussions to develop the most cost effective project which would reliably and effectively operate to <br /> the satisfaction of the Utility Department. This extra effort was deemed necessary by all parties with <br /> the knowledge that accurately estimating the cost of demolition and rehabilitation projects of this type <br /> is more difficult as compared to new projects. However, despite these efforts the three (3) project <br /> bids were in excess of the Utilities budget amount and our estimate for constructing this project. <br /> The project breakdown of cost has been acquired from two (2) of the three (3) bidding contractors and <br /> the Utility Staff and I have met and reviewed this information. It is the opinion of the Utility Staff and <br /> our office that the three (3) bids which were received are correct and accurately reflect the project cost <br /> as shown on the plans and described in the specifications. The low bid from R. J. Sullivan reflects the <br /> fact that they are under contract with Utilities Department on several projects currently and, therefore, <br /> their mobilization amount is less. It is our recommendation that the Utility Department should award <br /> the contract to R. J. Sullivan in the event that additional funding can be obtained to construct the <br /> project. As an alternative, the project cost can be reduced by eliminating the painting portion of the <br /> project, as well as the amount for contingencies which would result in approximately $150,000.00 in <br /> savings. This would reduce the project cost to approximately $500,000.00. The elimination of these <br /> bid items would also require that the project be rebid. <br /> In summary, it appears that it is not possible to construct this project based on the utility budget of <br /> $400,000.00. It will be necessary to increase the utility budget for this project in order to either award <br /> 1655 27"'Street,Suite 2 • Vero Beach, Florida 32960 <br /> Phone: (772)567-5300 • Fax: (772) 794-1106 <br /> mastmolr@bellsouth.net <br /> 69 <br />