My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/15/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/15/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:46:11 PM
Creation date
3/23/2016 8:46:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/15/2014
Meeting Body
Board of County Commissioners
Book and Page
317
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000D\S0003VK.tif
SmeadsoftID
13701
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Develop detailed work write-up reports and cost estimates on the <br />housing units that are to be rehabilitated as part of the NSP Project. <br />3. Coordinate and conduct pre-bid walkthroughs of the housing units by <br />the contractors. <br />4. Identify work items associated with the rehabilitation bidding process. <br />5. Provide the County with recommendations of award for the <br />rehabilitation bids received. <br />6. Complete contracts for the units to be rehabilitated or replaced. <br />7. Conduct pre -construction conferences and contract signings for the <br />units being rehabilitated. Complete, have executed, and record "Notices of <br />Commencement". <br />8. Record Deeds, Notes and Mortgages after execution. <br />9. Implement inspection procedures to be utilized during the <br />rehabilitation stage of the project. <br />10. Organize and maintain appropriate records regarding inspections <br />carried out during the rehabilitation stage of the project. <br />11. Inspect housing units and verify contractors' invoices at each draw as <br />well as completion of the rehabilitation project. Obtain "Release of Liens" from <br />contractors and sub -contractors prior to approving all draw requests. <br />12 <br />181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.