My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/22/2014
CBCC
>
Meetings
>
2010's
>
2014
>
04/22/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 6:38:00 PM
Creation date
3/23/2016 8:54:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/22/2014
Meeting Body
Board of County Commissioners
Book and Page
153
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004BG.tif
SmeadsoftID
14195
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 4.0 REQUEST FOR FUNDING ASSISTANCE FROM SJRWMD <br />Consultant will initiate discussions with SJRWMD regarding funding availability and options for an <br />alternative water supply project of this nature. Consultant will prepare for and participate in preliminary <br />meetings with SJRWMD to discuss/identify potential funding mechanisms. The budget provided in <br />Exhibit B reflects a level of effort of 12 hours. Additional meetings will be accommodated as budget <br />permits. This task does not include preparation of funding applications or supporting documentation. <br />Once a viable funding mechanism is identified, Consultant will prepare an amendment to this scope of <br />services to complete the required application and supporting documentation, to be authorized under <br />separate cover. <br />TASK 5.0 MEETINGS WITH INTERESTED PARTIES AND REGULATORY AGENCIES <br />Consultant will prepare for and participate in monthly meetings with the Soil and Water Conservation <br />District, Agricultural Advisory Committee and Board of County Commissioners to provide updates on the <br />analysis. The budget provided in Exhibit B includes six 1 -hour meetings to be attended by Consultant's <br />project manager. This task also includes two meetings to be attended by Consultant's senior technical <br />staff. Additional meetings will be accommodated as budget permits. <br />TASK 6.0 PROJECT AND QUALITY MANAGEMENT <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this scope is <br />consistent with Consultant's standards and the County's expectations. Specific activities included are <br />identified below: <br />Subtask 6.1 Project Quality Management <br />Consultant maintains a Quality Management System (QMS) on all projects. In accordance with the QMS <br />Quality Procedures, a project planning and scope review meeting will be conducted at the start of the <br />project. In addition, the Consultant's Technical Specialists will perform a quality reviews of the <br />deliverables identified in Tasks 1 through 4. <br />Subtask 6.2 Project Status Reports <br />Consultant's project manager will prepare and submit monthly written status reports with each invoice <br />for an anticipated project life of 4 months. <br />OTHER SERVICES NOT INCLUDED IN THIS INITIAL SCOPE OF SERVICES <br />Consultant and the County agree that there are a number of future steps required to solidify the <br />feasibility of constructing a reservoir system and corresponding treatment facility. The above Phase 1 <br />Scope of Services provides a first step in determining whether or not the subject property is suitable for <br />siting such a system and if acquisition of the site is feasible. If the feasibility study determines that it is <br />beneficial for the County to acquire the property and pursue a surface water storage project, the <br />following steps would be required (not included in this work order): <br />■ Detailed basin/watershed modeling to determine if adequate surface water volume is available to <br />supply a reservoir of the required size; <br />■ Modeling of proposed operations of the reservoir; <br />■ Preliminary and final design of a reservoir and intake structure; <br />■ Water quality evaluation to determine the specific pre-treatment requirements; <br />■ Design of a WTP tailored to treating runoff/surface water; <br />Design of the raw water pipeline; <br />■ Pre -application meetings with the regulatory agencies; and <br />■ Permit preparation and submittal. <br />A-7 <br />p1429REV5 (2) doc docx <br />109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.