Laserfiche WebLink
4. Traffic Engineering shall inspect and monitor the site prior to and after project <br />improvements are constructed and determine if additional signage is needed <br />relating to the alley that accesses the proposed parking lot and relating to parking <br />along Roseland Road. If Traffic Engineering determines that additional signage is <br />needed, the sign or signs shall be made and installed by the County and the church <br />shall pay the County the cost of making and installing the signs. <br />ATTACHMENTS: <br />1. Application <br />2. Location Map <br />3. Site Plan <br />4. Landscape Plan <br />5. Draft June 26, 2014 Planning & Zoning Commission Meeting Minutes <br />APPROVED AGENDA ITEM: <br />FOR: July 15 2014 <br />BY: <br />Indian River Co, <br />Appr. ekd <br />Date <br />Admin. <br />'1 J1/2/ <br />Legal <br />ttIP <br />int 40.1A <br />) - )'7 <br />Budget <br />A, <br />1-9 <br />7/ei// <br />Dept. <br />"r► <br />tt7/9 l41 <br />Risk Mgr. <br />F:\Community Development\CurDev\BCC\2014 BCC\RUMCParking(SP-SE-14-06-13).doc 6 <br />74 <br />