My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/16/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:08:58 PM
Creation date
3/23/2016 8:52:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/16/2014
Meeting Body
Board of County Commissioners
Book and Page
200
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A5.tif
SmeadsoftID
14150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />include a marina, a clubhouse, and a pool. Certain waivers from conventional single-family lot size <br />and setback requirements are being requested through the PD process. <br />The subject site is located on the north side of the CR 510 Causeway just west of the existing fixed <br />span bridge that crosses the intracoastal waterway. The upland portion of the property is zoned RM - <br />4 which allows for single and multi -family development at up to 4 units/acre. Wetland portions of <br />the project site are zoned CON -2 and have estuarine wetland density restrictions (1 unit/40 acres or <br />1 unit/acre transferred density). <br />The Marsh Island site has been the subject of previous development approvals and limited <br />construction. In 1982, the original Marsh Island development plan was approved; it was then <br />amended in 1985. Both plans provided for 109 multi -family units. Some residential structures, <br />infrastructure, and a 32 slip marina facility were constructed years agounder the 1982 plans. Due <br />to lack of construction, the 1985 amended plan that snperceded the 1982 plan expired and is no <br />longer valid. Therefore, no further development of the site can occur without approval of a new <br />development plan. <br />The proposed PD plan reflects the use of some of the existing infrastructure and the existing marina, <br />but reflects removal of the previously constructed residential structures. The residential structures <br />have already been demolished, as allowed and permitted under county regulations. <br />• PD Project Process <br />As a PD project, the process involved in review and approval of this proposal is as follows: <br />Approval Needed Reviewing Body <br />1. Conceptual Plan/Special Exception PZC & BCC <br />2. Preliminary PD Plan PZC <br />3. Land Development Permits or Waiver Staff <br />4. Final PD Plat BCC <br />The applicant is now requesting concurrent approval of steps I and 2. If the project is approved by <br />the Board of County Commissioners, the applicant will need to obtain a land development permit <br />for the required PD infrastructure improvements. <br />ATTACHMENT <br />uldlbccunarsh island staff report Page 2 of 8 <br />• <br />103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.