Laserfiche WebLink
• <br />• <br />LeTh <br />1 <br />• Board of County Commissioners Consideration <br />Pursuant to Section 971.05 of the LDRs, the Board of County Commissioners is to consider the <br />appropriateness of the requested conceptual PD plan based on the submitted PD plan and suitability <br />of the site for that use. The Board may approve, approve with conditions, or deny the special <br />exception use. The County may attach any conditions and safeguards necessary to mitigate impacts <br />and to ensure compatibility of the use with the surrounding area. <br />Planning and Zoning Commission Action <br />At its regular meeting of July 13, 2000, the Planning and Zoning Commission voted unanimously <br />(7-0) to approve the project with the addition of several conditions. These conditions include; <br />provision of a right -turn lane on CR 510 at the project's entrance, elimination of the zero sideyard <br />setback for driveways on the larger lots pots #1-20), retention of stumps within the wetland areas <br />to limit the disturbance to the soil, and the removal of exotics to be done in phases. Staff has <br />incorporated all but the right -turn lane condition into its recommendation. The basis for the <br />recommended conditions are contained in the analysis portion of this report. <br />The substantial time difference between the date that this project was considered by the Planning and <br />Zoning Commission and the scheduled November 14, 2000 Board of County Commissioners public <br />bearing on this project is due to the applicant reconsidering the design of the project. After the July <br />13th Planning and Zoning Commission meeting, the applicant delayed forwarding the project to the <br />Board of County Commissioners to allow time for some minor design modifications. Consequently, <br />the applicant made some design modifications to the proposed preliminary PD plan. Because the <br />design modifications did not increase the number of lots proposed and did not reduce buffers or open <br />space, the revised plan does not require reconsideration by the Planning and Zoning Commission and <br />may now be considered by the Board. As proposed, the design changes do impact slightly more <br />wetlands (.02 additional acres) by shifting the entry road closer to the marina and moving two lots <br />to.the west side of the entry road. Other changes include the shape of the stormwater tract and the <br />shape of lots adjacent to the stormwater tract along with revised setbacks for various lot types. It <br />should be noted that all lot sizes either increased or stayed the same, while some of the proposed <br />setbacks decreased and some others increased. <br />ANALYSIS: <br />1. Size of Development Uplands: 17.02 acres <br />Wetlands: 10.18 acres <br />Total: 27.20 acres <br />2. Zoning Classifications: <br />RM -4 Residential Multi -Family (up w 4 units/acre): 17.02 acres <br />CON -2 Estuarine Wetlands Conservation (up to 1 unit/40 acres or 1 unit/acre <br />transferred density): 10.18 acres <br />uld\bcclrnarsh island staff report <br />ATTM;flef2thir l. <br />Page 3 of 8 <br />104 <br />