My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/16/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/16/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 5:08:58 PM
Creation date
3/23/2016 8:52:23 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/16/2014
Meeting Body
Board of County Commissioners
Book and Page
200
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A5.tif
SmeadsoftID
14150
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 25, 2014 <br />NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />"EXHIBIT 1" <br />WORK ORDER NO.7 <br />(Time Schedule) <br />Time of Performance <br />The estimated time frame for completion of services from the approval of this Work Order <br />is as follows: <br />MILESTONE COMPLETION DATE <br />Tasks A, B, and C 180 Calendar Days after Notice To Proceed <br />Note: <br />The time for completion of the 60% design drawings, permit applications and Engineer's <br />Opinion of Probable Construction Cost for the project shall be four (4) months from notice <br />to proceed. Once permits are received, 100% design drawings shall be completed in sixty <br />(60) calendar days thereafter. <br />136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.