My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:57:47 PM
Creation date
3/23/2016 8:52:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2014
Meeting Body
Board of County Commissioners
Book and Page
298
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A4.tif
SmeadsoftID
14149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
659
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Melvin Bush Construction Inc. <br />2748 SW Casella St <br />Port St. Lucie, FL 34953 <br />State of Florida License# CUC1223819 <br />Phone: (772) 336-0623 Fax: (772) 336-0488 <br />Email: melvinbushconstr@bellsouth.net <br />Invoice <br />Date Invoice No <br />August 6, 2014 <br />Bill To: <br />Project <br />INDIAN RIVER COUNTY PURCHARSING DIVISION <br />1800 27TH ST I <br />VERO BEACH, FL <br />Young's Market <br />MELVIN BUSH LABOR COST <br />Item No. <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />71 <br />Mobilization, Demobilization, MOT <br />10% <br />% <br />72955.00 <br />$ 7,295.50 <br />Old <br />Install 8" PVC Water Main <br />100 <br />LF <br />7.00 <br />$ 700.00 <br />01f <br />Install 12" PVC Water Main <br />110 <br />LF <br />9.00 <br />$ 990.00 <br />05e <br />Install 12" HDPE Dir. Bore, Including Fusion <br />of Pipe and MJ Adapters <br />760 <br />LF <br />41.00 <br />$ 31,160.00 <br />17d <br />Install 10" GV& B <br />2 <br />EA <br />175.00 <br />$ 350.00 <br />29f <br />Install 10 PVC Force Main <br />10 <br />LF <br />9.00 <br />$ 90.00 <br />11b <br />Grout Pipe Abandonedand Left in Place, 10" <br />to 12" <br />1000 <br />LF <br />8.00 <br />$ 8,000.00 <br />7 <br />Install Mechanical Restrained Joint DI <br />Fittings <br />2.00 <br />TON <br />3,500.00 <br />$ 7,000.00 <br />21 <br />Test Holes! Potholes <br />20.00 <br />EA <br />200.00 <br />$ 4,000.00 <br />64a <br />Lawn Restoration ( Topsoil and Sod) <br />100 <br />LF <br />0.40 <br />$ 40.00 <br />Total <br />$ 52,330.00 <br />ITEMS NOT INCLUDED <br />15d <br />Install and Remove Line Stop on Existing 10" <br />Main <br />3 <br />EA <br />4,175:00 <br />$ 12,525.00 <br />16b <br />Install Water Service- Single Short with 1" <br />1 <br />EA <br />200.00 <br />$ 200.00 <br />14a <br />Install Stainless Steel Wet Tap Assembly w! <br />GV (4" - 8") <br />1 <br />EA <br />900.00 <br />$ 900.00 <br />16c <br />Install Water Service- Single Short with 2" <br />1 <br />EA <br />250.00 <br />$ 250.00 <br />Total <br />$ 13,876.00 <br />AS INDICATED FOR LINE STOPS <br />Material Supplied for ( 1) 10" Line Stop <br />1 <br />LS <br />2,750.00 <br />$ 2,750.00 <br />(Not Provided by County) <br />Total <br />$ 2,750.00 <br />AS INDICATED TO MOVE VALVES <br />SURVEY CREW & AS-BUILTS <br />1 <br />LS <br />4,000.00 <br />$ 4,000.00 <br />Total <br />$ 4,000.00 <br />SUB -TOTAL <br />$ 72,965.00 <br />Total $ 80,260.60 <br />175 <br />
The URL can be used to link to this page
Your browser does not support the video tag.