Laserfiche WebLink
Consent Agenda Item <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: August 28, 2014 <br />To: Joseph A. Baird, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: Arjuna Weragoda, P.E., Capital Protects Manager AG) <br />Subject: Amendment No.2 to WO No.5-South County RO Facility Storage & Piping Tank <br />Modifications <br />DESCRIPTIONS AND CONDITIONS: <br />On February 19th, 2013, the Indian River County Board of County Commissioners (BCC) approved <br />Work Order No. 5 for a lump sum amount of $16,800.00 with Moia Bowles Villamizar & Associates <br />(MBV) to provide professional services for the design and construction observation of the <br />interconnecting operating system project between the South and North RO plants. On December 17, <br />2013, Addendum No.1 was issued to MBV for a lump sum amount of $1,500.00 to provide more <br />details in the specifications and construction plans on the electrical components of the project. On <br />May 6, 2014 the BCC awarded the contract to Florida Design Drilling Corporation for a sum amount of <br />$142,765.00. However, during construction staff decided that the addition of dry conduit and pull <br />box for future fiber with the current project will be a cost savings to the County. Therefore, the <br />subject amendment to MBV is to add the above additional work, review shop drawings and <br />construction oversight. <br />ANALYSIS: <br />MBV has requested additional funding to perform the work mentioned above. Therefore, staff <br />requested MBV submit a proposal for the additional work per the CCNA procurement guidelines. <br />MBV submitted Amendment No.2 to Work Order No.5 under the Continuing Contract Agreement <br />for Professional Services approved by the BCC On November 15th, 2011. <br />The total negotiated cost to include the engineering services is $3,750.00, which brings the total <br />amount of Work Order No.5 to $22,050.00. <br />F:\Utilities\UTILITY- Engineering\WATER \WTP-South RO\S. RO Storage Tank Interconnect\Admin\Amendment No.2 to W0.5 MBV.doc <br />176 <br />