My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:57:47 PM
Creation date
3/23/2016 8:52:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2014
Meeting Body
Board of County Commissioners
Book and Page
298
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A4.tif
SmeadsoftID
14149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
659
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />194 <br />Melvin Bush <br />Construction, inc. <br />0 <br />O <br />O <br />0 <br />O <br />vt!1� <br />a <br />0 <br />O <br />a <br />q <br />o <br />O <br />.-� <br />a <br />O <br />N <br />N <br />0 <br />O <br />0 <br />+h <br />o <br />O <br />N <br />0 <br />O <br />V} <br />0 <br />a <br />0 <br />a <br />8 <br />o <br />O <br />m <br />Crl V} <br />a <br />O <br />tY:fY}} <br />V} <br />o <br />q <br />m <br />V> I <br />0 <br />q <br />m <br />iA <br />0 <br />O <br />pap <br />Vl <br />0 <br />O <br />m <br />�!Y <br />0 <br />O <br />t <br />aA <br />0 <br />Q <br />m <br />0 <br />q <br />O <br />N <br />Blue Goose Growers, <br />LLC d/b/a Blue Goose <br />Construction <br />O <br />0 <br />O <br />0 <br />O <br />0 <br />�? <br />O <br />y0 <br />iA <br />O <br />0 <br />N <br />O <br />00 <br />ay <br />O <br />0 <br />O <br />V! <br />O <br />0 <br />,-7 <br />V1 <br />O <br />0 <br />O <br />Vf <br />O <br />Ooh <br />N <br />Vf <br />O <br />0 <br />N <br />V. <br />O <br />8o <br />fYt <br />VI <br />If <br />m <br />VMF <br />noLei <br />06 <br />ice/} <br />to <br />Vl <br />m <br />M <br />O <br />O <br />VOf <br />O <br />o <br />on <br />n/! <br />$90.00 <br />UNIT OF <br />MEASURE <br />LF <br />LF <br />"May Require AdditionatCrane Rental Cost for Placement Depending on Weight <br />and/or Length <br />LF <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />J <br />LL <br />LL <br />LL <br />LL <br />LL <br />LF <br />LL <br />)ii - <br />)y <br />Y <br />e'1 <br />a"1 <br />r'1 <br />a"1 <br />a'i <br />'i <br />e'1 <br />• <br />DESCRIPTION <br />'Assemble 14" Welded Flange Steel Pipe Water Main <br />for Placement on S5 Bridge Hangers <br />*Assemble 16" Welded Flange Steel Pipe Water Main <br />for Placement on SS Bridge Hangers <br />install Driveway Bores for Carrier Pipe (Paid for <br />Separately) Y through 8" <br />Install Driveway Bores for Carrier Pipe (Paid for <br />Separately) 10" through 12" <br />Install Driveway Bores for Carrier Plpe (Paid for <br />Separately) 14" through 16" <br />Jack & Bore w/ 4" DI Carrier Pipe including excavation, <br />backfill, dewatering and casing insulators <br />Jack & Bore w/ 6" DI Carrier Pipe induding excavation, <br />backfill, dewatering and casing insulators <br />Jack & Bore w/ 8" DI Carrier Pipe including excavation, <br />backfill, dewatering and casing insulators <br />Jack & Bore w/ 10" DI Carrier Pipe including excavation, <br />backfill, dewatering and casing Insulators <br />Jack & Bore w/ 12" DI Carrier Pipe including excavation,', <br />backfill, dewatering and casing Insulators <br />Jack & Bore w/ 14" DI Carrier Pipe including excavation, <br />backflll, dewatering and casing insulators <br />Jack & Bore w/ 16" DI Carrier Pipe including excavation, <br />backfill, dewatering and casing insulators <br />Install 2" through 4" HDPE Horizontal Directional Drill <br />(SDR -11) including fusion of MJ adaptors <br />Install 6" HOPE Horizontal Directional Drill (SDR -11) <br />induding fusion of MJ adaptors <br />Install B" HDPE Horizontal Directional Drill (SDR -ii) <br />including fusion of MJ adaptors <br />Insta1110" HDPE Horizontal Directional Drill (SDR -1.1) <br />including fusion of MJ adaptors <br />Install 3.r HDPE Horizontal Directional Drill (SDR -11) <br />including fusion of MJ adaptors <br />Install 14" HDPE Horizontal Directional Drill (SDR -11) <br />including fusion of MJ adaptors ___ <br />Install 16" HDPE Horizontal Directional Drill (SDR -11) <br />including fusion of MJ adaptors <br />I,: z <br />6 <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />ro <br />O <br />O <br />O <br />O <br />a <br />O <br />8 <br />194 <br />
The URL can be used to link to this page
Your browser does not support the video tag.