My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2014
CBCC
>
Meetings
>
2010's
>
2014
>
09/09/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 2:57:47 PM
Creation date
3/23/2016 8:52:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/09/2014
Meeting Body
Board of County Commissioners
Book and Page
298
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000E\S0004A4.tif
SmeadsoftID
14149
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
659
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
195 <br />Mehrin Bush <br />Construction, Inc. <br />O <br />ice/! <br />O <br />N <br />V! <br />0 <br />.~-1 <br />N <br />NO1�1 <br />.-1 <br />V! <br />(H((1�� <br />ei <br />V! <br />H <br />el <br />N <br />8 <br />epi <br />V! <br />0 <br />8 <br />NV! <br />a <br />0 <br />b <br />pO <br />(� <br />H <br />V! <br />ooO <br />00 <br />.1 <br />K <br />O <br />N <br />J <br />00'oT$ <br />0 T <br />N <br />V! <br />S <br />04 iti <br />H <br />y <br />O <br />14 <br />S <br />N <br />C <br />Ol <br />K <br />4 <br />N <br />N <br />u0t. <br />y <br />Blue Goose Growers, <br />LLC dlbla Blue Goose <br />Construction <br />0O0 <br />s°Di! <br />iii! <br />ci <br />V! <br />1 <br />D <br />.^'� <br />H <br />8 <br />an <br />S <br />'aei <br />iA <br />inofo <br />V? <br />8 <br />ei <br />V <br />8 <br />V! <br />o <br />0 <br />0O <br />o <br />00 <br />id <br />V! <br />O <br />of <br />VI <br />g$ <br />ni <br />.H <br />V! <br />v <br />4.4! <br />► <br />% <br />tri <br />V <br />$ <br />V1 <br />e i <br />e+ <br />V! <br />ooin <br />V! <br />od <br />od <br />V! <br />IA <br />la <br />LL ce <br />m <br />J <br />J <br />J <br />u. <br />..1 <br />U. <br />.J <br />1 <br />J <br />uol <br />W <br />6 <br />J <br />J <br />J <br />IL <br />J <br />J <br />J <br />LF <br />J <br />J <br />J <br />.F�/' <br />x;11 <br />a <br />ei <br />ei <br />4 <br />ei <br />-, <br />.♦ <br />ei <br />.y <br />ei <br />ei <br />e4 <br />.-1 <br />el <br />4-1 <br />N <br />el <br />e1 <br />ei <br />el <br />e1 <br />el <br />DESCRIPTION <br />Install 4" HDPE (SDR -11) in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install 6" HDPE (SDR -11) in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install 8" HOPE (SDR -11 in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install 10" HDPE (SDR -11 in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install 12" HDPE (SDR -11 In Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />install 14" HDPE {SDR -11 in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install 16" HDPE (SDR -11) in Open -Cut, Trench Method, <br />Fusion Weld Sections as Necessary for Total Length <br />Install Mechanical Restrained Joint Ductile Iron Fitting <br />install Mechanical Restrained Joints on Existing Main, <br />3" through 8" <br />install Mechanical Restrained Joints on Existing Main, <br />10" through 14" <br />;install Mechanical Restrained Joints on Existing Main, <br />116" <br />Lower/Offset Pipe by Excavation After Restraining <br />Joints, 3" through 8" <br />Lower/Offset Pipe by Excavation After Restraining <br />Joints, 10" through 12" <br />Lower/Offset Pipe by Excavation After Restraining <br />Joints, 14" through 16" <br />LRemove and Disposal of Pipe, 3" through 8" <br />ei <br />ea <br />z <br />2 <br />L <br />iQY <br />l"I <br />Er <br />0 <br />1` <br />fli <br />0 <br />a <br />G1 <br />TS <br />0 <br />co <br />To <br />g <br />E <br />d <br />ce <br />Removal and Disposal of Pipe, 14" through 16" <br />Grout Pipe Abandoned and Left in Place, 3" through 8" <br />Grout Pipe Abandoned and Left in Place, 10" through <br />12" <br />'Grout Pipe Abandoned and Left in Place, 14" through <br />16" <br />Pig Lines, Flush and Pressure Test Pipe, 6" or 8" <br />including installation of cannon and all fittings <br />necessary <br />WW <br />F Z <br />ptpq <br />O <br />v <br />o <br />0p <br />O <br />o <br />�O <br />p <br />1 <br />°1 <br />tp <br />O <br />.p1 <br />O <br />~ <br />H <br />e~1 <br />- <br />eNi <br />.�1 <br />.N1 <br />.mi <br />.mi <br />rri <br />el I <br />195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.