Laserfiche WebLink
SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> Bid No. 2015017 <br /> 12" Transmission Water Main Extension in Vero Lake Estates <br /> THIS AGREEMENT ("Agreement" or"Contract") dated 20 <br /> by and between Indian River County, a political subdivision of the State of Florida ("OWNER") and <br /> Tri-Sure Corporation of Auburndale, Florida ("CONTRACTOR"). <br /> BACKGROUND RECITALS <br /> A. Pursuant to applicable provisions of Florida law, OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents as defined in Article 8 of this <br /> Agreement and the term is as set forth in the Contract Documents. <br /> B. CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents. <br /> NOW THEREFORE, OWNER and CONTRACTOR, in consideration of the mutual covenants <br /> hereinafter set forth, and intending to be legally bound, agree as follows: <br /> ARTICLE 1 WORK <br /> 1.1. Contractor as an independent contractor and not as an employee shall furnish and complete all of the <br /> necessary labor, material and equipment to perform the work as specified or indicated in the Contract <br /> Documents and per FDEP, the Indian River County Department of Utility Services and County Engineering <br /> Department standards. The wok is generally described as follows: <br /> The proposed work generally consists of furnishing all labor, materials, tools and equipment to construct <br /> approximately 6,800 feet of 12" PVC and HDPE water main including gate valves, fire hydrants and fittings. <br /> All work will include maintaining traffic control, complete restoration and all other appurtenant and <br /> miscellaneous related items and work for a completed project. It is the intent of the Indian River County <br /> Department of Utility Services to obtain complete and working installations under this contract and any items <br /> of labor, equipment, and materials that may reasonably be assumed as necessary to accomplish this end <br /> shall be supplied whether or not they are specifically stated herein. All work as shown on the construction <br /> plans will be done in accordance with the Indian River County Department of Utility Services Water & <br /> Wastewater Utility Standards, March 2014 or latest edition, unless specified differently in the individual Work <br /> Authorizations or changed by the Engineer or his representative. The work is south of CR 512 on 106th <br /> Avenue, then west on 94th Street, then south on 107th Avenue, then east on N 89th Street and S. 891h Street to <br /> 104"'Avenue. <br /> The construction of the utility improvements described above shall also consist of, but not limited to: resetting <br /> of signs, mailboxes, and other existing facilities disturbed during construction; utilities exploration; <br /> coordination with any permitting agencies; trenching; clearing and tree removal; dewatering; installation of <br /> pipe, structures and all appurtenances; fittings and restrainers; soil backfill compaction; testing; (including <br /> backfill and subgrade testing); road, landscape and driveway restoration; re-grading and grassing (sod); <br /> mobilization, demobilization and traffic control, All right—of-way shall be restored to like or better condition. No <br /> excavation shall be left open when work is not actively being performed. Construction fencing used in the <br /> work area shall not block sight distance near intersections or driveways. All construction equipment and <br /> M.. materials shall be stored a minimum of 15 feet from the edge of pavement and shall be protected by Type II <br /> barricades with flashing yellow lights. <br /> 00530-1 <br /> ATTACHMENT 5 88 <br />