Laserfiche WebLink
i <br /> Indian River County Department of Utilities <br /> LABOR AND MATERIALS COST ESTIMATE USING LABOR CONTRACT <br /> 107th Avenue 12"Master Plan <br /> Transmission Water Main Loop in Vero <br /> Prolat: Lakes FJrtates <br /> Dye 1KVLu;xernw l7,I4I-k Jh tW J24-JJ <br /> LABOR COST MAMRIAIS <br /> Bid Bid Item Estimated Unit of Labor Unit Total I bor Material Uait Total Material <br /> Item Na Description vaatity Measure Price Price Price Price <br /> 91 Mobili.tion,Demobilization MOT 106 0.10 $15,846.25 <br /> Olf Install 12'PVC Water Main 6,500 LF $10.00 $65,000.00 $18,06 $117,390.00 <br /> Insult I2"HDPE Directional Bore Including MJ <br /> He Ada ors and Fwion'Pi 300 LF $66.00 S19 800.00 $26.43 S7 29.00 <br /> Install 12'NRS Resilient Seated Gate Valve& <br /> 190 Bos 12 EA $250,00 S3,000.00 $1,18723 314 46.76 <br /> Install 9"PVC Water Main 250 LF S8.00 $2000.00 $8.52 $2,130.00 <br /> Install 8'Reslient Seated Gate Valve&Bo' 15 EA $200.00 S3 000.00 $619.11 $9,286,65 <br /> 20B stmv/t6allTNawFireW <br /> 6 <br /> n V & etTp <br /> leeve FA $2000.00 SI 000.00 $1291.49 $7748.94 <br /> 09 Install Mechanical Restrained Joint DI Fittings 4 TON 54,100.00 $16,400.00 $4,100.00 $16.400.00 <br /> 23 Test Holes/Potholes 14 EA. $250.00 S3,500.00 <br /> Fill,pressare test,chlorinate and[lush water mein, <br /> 29b 10-throe 16' 6,800 LF 52.00 513,600.00 <br /> Install Sampk Point per County Detail,Removc 8 EA $275.00 $500.00 <br /> 30b after FDEP Clearance $200.00 <br /> 30q Take Bacterial Semple,Delim to Lab for Testing 14 5150.00 52,100.00 <br /> Lnm Restoration(Topsoil and Sod)Includes 7,050 SY S2.25 $2.50 <br /> 86a Watering $15,862.50 $17,625.00 <br /> Subtotal Subtotal Water System Labs I 5158,462.50 $192,756.35 <br /> Subtotal Subtotal Water System Lm <br /> abor,Mob.,Deob., <br /> MOT Materials &Permifting S174,308.75 <br /> Face Acott. IRCDUS Contingency Account I EA 010 $17,430.88 $19,275.64 <br /> Subtotal Subtotal Water System Lebo&Contingency $191,739.63 $212,031.99 <br /> Bond Public Construction Bond 4 % $7,669.59 <br /> SabToul SI99,409.21 1212,031.99 <br /> TOTAL S41] 41.20 <br /> ATTACHMENT 4 <br /> 00 <br />