Laserfiche WebLink
In order to execute this project in the most cost effective manner, with the most aggressive <br /> schedule, Schulke,Bittle&Stoddard,L.L.C. will: <br /> - Rely on building plans and building department records obtained from the IRC utility <br /> department and IRC building department for as-built conditions of the WWTP <br /> components. <br /> - Utilize the IRC utility department standard bid documents and construction contract, <br /> which documents shall be provided in an editable format by IRC to SBS. <br /> - SBS may retain consultant(s)at its discretion, which may include one or more companies <br /> whose primary occupation is providing and installing lining systems for existing utility <br /> structures. SBS has budgeted up to$1,000.00 for these services. <br /> 2 of 2 <br /> 101 <br />