My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/06/2015
CBCC
>
Meetings
>
2010's
>
2015
>
01/06/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:40:42 AM
Creation date
3/23/2016 9:22:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Agenda Packet
Document Type
Agenda Packet
Meeting Date
01/06/2015
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
112-0017-R
Book and Page
273
Subject
Mediation Update Indian River Shores
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000M\S00060I.tif
SmeadsoftID
14736
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT`2' <br /> FEE SCHEDULE <br /> WORK ORDER NO.1 <br /> Method and Amount of Compensation <br /> Schulke,Bittle&Stoddard,L.L.C.,proposes to provide the above Scope of Services based on the following lump sum <br /> fees: <br /> 1.Preliminary plan review and evaluation: $3,000.00* <br /> A. Review the existing WWTP plans of record.On-site evaluation <br /> of the existing head works and system components,including: <br /> - On-site review—photograph and document existing conditions,where possible <br /> - Coordinate field review(s)with consultant(s) <br /> B. Prepare preliminary drawings and prepare take-off/construction estimate based on <br /> field review,consultant's input,and consider rehabilitation options and make recommendation <br /> on repairs. <br /> 2.Final Design $2,500.00 <br /> Engineering design:preparation of Construction Plans,detailed specifications, <br /> and construction details. <br /> 3.Contractor procurement/bid documents $3,000.00 <br /> Preparation of bid documents using IRC standard forms.Assistance during <br /> Bidding,including preparation of an approved contractors bid list,coordinating <br /> and chairing a pre-bid meeting,process answers to RFI's,bid evaluation,prepare <br /> addendum(if necessary)and prepare recommendation of contract award. <br /> 4.Contract Administration and Construction Phase services $6,000.00 <br /> w <br /> Coordinate and chair a pre-construction meeting,shop drawing sample review, <br /> review progress payments,prepare minor plan modifications,Construction/Field <br /> Inspections,as-built review,coordinate post construction conference and inspect <br /> structure for warranty approval,and review final documentation for close-out and <br /> prepare notice of substantial completion,final recommendation for payment upon <br /> satisfactory job completion.Inspections portion of this fee based on: <br /> Assume 3 hours/day @ 20 days <br /> 5.Reimbursable Expenses:(estimated) $1,000.00 <br /> Payment of direct costs,including Reproduction costs(prints and copies), <br /> application fees,mail and delivery,mileage during constriction phase services. <br /> (See below for actual costs) <br /> Total: $15,500.00 <br /> Grand Total $15,500.00 <br /> *Includes up to$1,000.00 for consultants <br /> 1 of 2 <br /> 102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.