My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/10/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/10/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:51:53 AM
Creation date
3/23/2016 9:13:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Added Agenda Item
Meeting Date
02/10/2015
Meeting Body
Board of County Commissioners
Book and Page
157
Subject
Custodial Svcs County Bldg
Agenda Packet B
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000J\S0005FC.tif
SmeadsoftID
14620
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />MEMORANDUM 2 Rl� <br />TO: Joseph A. Baird <br />County Administrator <br />DEPARTMENT HEAD CONCURRENCE: <br />-,,� 0;-e547 li <br />Stan Boling, AICP(J <br />Community Development Director <br />FROM: Roland M. DeBlois, AICP-M> <br />Chief, Environmental Planning <br />DATE: February 3, 2015 <br />RE: Approval of Change Orders and Release of Retainage under a Contract <br />Agreement with Bayshore Construction, Inc. for Construction of a Wetland <br />Boardwalk and Observation Deck on the Flinn Tract of the Lagoon Greenway <br />It is requested that the Board of County Commissioners formally consider the following information at <br />the Board's regular meeting of February 10, 2015. <br />DESCRIPTION AND CONDITIONS <br />On April 8, 2014, the County entered into a construction agreement with Bayshore Construction, Inc. to <br />construct "Phase 213" wetland boardwalk and observation deck improvements on the Flinn Tract of the <br />Lagoon Greenway (see Attachment 3). The Lagoon Greenway is located on the east side of Indian River <br />Boulevard, south of Vero Beach city limits. <br />Under the original construction agreement, the cost estimate for constructing the wetland boardwalk and <br />lagoon observation deck was $278,393.91. For the Board's approval consideration, attached to this report <br />are to two change orders that will revise the project cost to $283,903.76 (a net increase of $5,509.85). <br />The Change Orders are summarized as follows: <br />• Change Order 1: $6,452.00 for an additional 20 linear feet of wetland boardwalk and 116 <br />additional linear feet of ADA hand railing, based on the actual linear footage needed to traverse <br />the wetland vs. the bid contract estimate. <br />Change Order 2: -$942.15 to account for an adjustment in building permit costs. The actual cost <br />was $306.00, which is $942.15 less than the $1,248.15 estimate in the bid contract (re: a <br />combined building permit was issued vs. two individual permits for the structures). <br />196 <br />
The URL can be used to link to this page
Your browser does not support the video tag.