My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/10/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/10/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 11:51:53 AM
Creation date
3/23/2016 9:13:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Added Agenda Item
Meeting Date
02/10/2015
Meeting Body
Board of County Commissioners
Book and Page
157
Subject
Custodial Svcs County Bldg
Agenda Packet B
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000J\S0005FC.tif
SmeadsoftID
14620
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At this time, the Phase 213 wetland boardwalk and lagoon observation deck improvements have been <br />completed. To that end, staff is requesting that the Board approve the change orders and final payment to <br />Bayshore Construction, including release of approximately 5% of the project cost ($13,558.29) that has <br />been retained pending completion of the project. <br />ANALYSIS <br />The Lagoon Greenway Phase 213 project entails construction of a +1,140 foot long wetland boardwalk <br />and a lagoon observation deck. The County has been awarded a Florida Department of Environmental <br />Protection (FDEP) Recreational Trails Program (RTP) grant and a Florida Inland Navigation District <br />(FIND) Waterways Assistance Program (WAP) grant for the project. On September 13, 2011, the Board <br />appropriated $209,000 in Park Impact Fees for the overall project. The allocated funds are reflected in the <br />County's Five -Year Schedule of Capital Improvements. Account number 10321072-066510-11001 has <br />been set up for this project. <br />The budgeted cost estimates for the Phase 213 are summarized as follows: <br />Lagoon Greenway Phase 2B Budgeted Cost Estimates <br />Project Element Total Cost FIND Grant RTP Grant County Cost <br />(50%) <br />Construct +1,140' of wooden $200,000 $100,000 $100,000 N/A <br />boardwalk <br />Lagoon observation deck $92,000 $46,000 N/A $46,000 <br />Project engineering oversight, $20,000 $10,000 $9,000 $1,000 <br />permitting and inspections <br />Totals $312,000 $156,000 $109,000 $47,000 <br />Bayshore Construction Inc.'s bid contract of $278,393.91, adjusted to $283,903.76 by the attached two <br />change orders, is within the estimated cost -range that has been budgeted for this project. <br />To date, the County has paid Bayshore Construction $257,607.47 for the contracted work, leaving <br />$26,296.29 (as adjusted by the attached change orders and including retainage) to be paid to close out the <br />contract. County staff is in the process of applying for reimbursement from FIND and FDEP for matching <br />grant funds. <br />Funding <br />The County Commission has approved up to $209,000 in Park Impact Fees for use as a match towards the <br />Lagoon Greenway overall public access improvements. Account number 10321072-066510-11001 has <br />been set up for this project. This expenditure is to be reimbursed from Account number 10321072- <br />066510-11001. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners approve the attached change orders and <br />release of retainage under the Lagoon Greenway Phase 213 Construction Agreement with Bayshore <br />Construction, Inc., and authorize staff to process the final payment of $26,296.29 to Bayshore <br />Construction using funding from the referenced account. <br />2 <br />M:\LAAC\Flinn Tract aka Lagoon Greenway\FIND Grant App Phase B\Bayshore Construction Change Ord Rel of Retainage BCC item for 2-10- <br />15.doc <br />197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.