My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2013
CBCC
>
Meetings
>
2010's
>
2013
>
03/10/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 1:48:20 PM
Creation date
3/23/2016 9:15:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Book and Page
158
Supplemental fields
FilePath
H:\Indian River\Network Files\SL00000K\S0005JM.tif
SmeadsoftID
14664
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order No. 1— Exhibit "A" <br />49th Street/USI Intersection Improvements <br />Page 2 of 5 <br />signage elements, and sidewalks. The Conceptual Plans shall be submitted to Indian River <br />County Engineering for review and acceptance prior to our proceeding with additional design <br />services. <br />It is our intent to design the 49th Street 3 -Lane section (Old Dixie to U.S. Highway # 1) / turn <br />lane improvements centered on the quarter -section line. We expect the Old Dixie Highway turn <br />lanes to be accomplished via a west side widening. In order to be eligible for a SJRWMD <br />Permit Exemption, the turn lane improvements will be designed without the need for curbing and <br />storm conveyance piping to eliminate the need for treatment facilities (which might necessitate <br />the County purchasing stormwater treatment tracts). <br />During this task, we will coordinate with Jill Grimaldi of CDM Smith, the County's liaison for the <br />"All Aboard Florida" (AAF) Railroad project. It is understood our Concept Plans will be submitted <br />by CDM to the Florida East Coast Railroad (FECRR) in order that they may plan and design for <br />the expanded roadway improvements to be constructed with this project, as well as their <br />planned calming devices. We will make adjustments to the Conceptual Plans based on <br />feedback received by Indian River County via CDM Smith. <br />Preliminary Construction Plans <br />Preparation of Preliminary Plans for the planned project improvements to include: <br />Title Sheet <br />Construction Notes <br />Summary of Pay Items <br />1� Roadway Improvements Plan Views <br />Roadway Profile Views (as Necessary) <br />Cross-sections <br />Striping & Signage Plans <br />Construction Details <br />The Preliminary Plans shall be prepared based on the following design criteria: <br />Ex. Posted Speed ProD Posted Speed Desian Saeed <br />49th Street (W. of Old Dixie) <br />30 mph <br />35 mph <br />40 mph <br />49th Street (E. of Old Dixie) <br />n/a <br />35 mph <br />40 mph <br />Old Dixie (N. of 491h St.) <br />45 mph <br />45 mph <br />50 mph <br />Old Dixie (S. of 491h St.) <br />35 mph <br />35 mph <br />40 mph <br />In order to accommodate the future signalization of the intersection of 49th Street and Old Dixie <br />Highway, the intersection paving shall be designed to be plateaued. <br />Final Construction Plans <br />Following your review of the Preliminary Construction Plans, we shall make revisions to address <br />your concerns and convert the plans into Final Construction Plans. The Final Construction <br />Plans shall be utilized for acquisition of permits for the project. <br />Ll <br />M 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.