Laserfiche WebLink
MAY 2 2 1990 <br />BOOK <br />80 <br />their growth <br />indicates they need additional parking, he <br />was <br />not <br />sure it is our responsibility to go out and acquire land and put <br />in parking for them. Possibly they need to be looking at <br />acquiring some additional property themselves. <br />The Administrator advised that is why we are asking that <br />they consider participating in the funding. <br />ON MOTION By Commissioner Bird, SECONDED by Commis- <br />sioner Wheeler, the Board unanimously authorized staff <br />to pursue acquisition of the 2j lots missing from Block <br />6, Booker T. Washington S/D (Lots 4, 5 S 4 of Lot 6); <br />to explore the various options discussed above; and to <br />work on preliminary design of a parking lot. <br />PROFESSIONAL SERVICES AGREEMENT W/MARSHALL, McCULLY (REPLACEMENT <br />BRIDGE OVER SOUTH RELIEF CANAL) <br />The Board reviewed memo from the Public Works Director: <br />----------------------------------------------------------------- <br />TO: James Chandler <br />County Administrator <br />THROUGH: James W. Davis, P.E. h� <br />Public Works Directory <br />FROM: Roger D. Cain, P.E. `I <br />� <br />County Engineer 1� <br />SUBJECT: Professional Services Agreement for <br />Marshall, McCully & Associates for <br />Replacement Bridge over the South Relief Canal at <br />20th Avenue <br />DATE: May 2, 1990 <br />----------------------------------------------------------------- <br />DESCRIPTION AND CONDITIONS <br />On December 12, 1989 the Board of County Commissioners authorized <br />staff to proceed with negotiations for selection of consultant <br />and professional engineering services for replacement bridge over <br />the South Relief Canal at 20th Avenue. We have received a <br />Professional Services Agreement from Marshall, McCully & <br />Associates. Staff has reviewed the cost estimates from this firm <br />for engineering services, they are as follows: <br />1. Perform a location and topographic survey of the <br />site, perform a hydraulic analysis/review of the <br />canal as required, design and prepare a complete <br />set of construction plans, apply for the necessary <br />32 <br />� � r <br />