My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/26/1990
CBCC
>
Meetings
>
1990's
>
1990
>
6/26/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:45 PM
Creation date
6/16/2015 9:08:58 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/26/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. McCain explained that this is doing a small water line <br />job we have off of 9th Avenue where we have had major well <br />failures. <br />Commissioner Wheeler asked if this isn't the second time we <br />have done this with the same company, and Mr. McCain advised that <br />we had a similar situation with Summerplace (east) but a <br />different contractor. This same contractor was involved with <br />Heron Caye recently, but that was a separately bid job. <br />Commissioner Scurlock further explained that we extended the <br />6th Avenue contract unit price up to Summerplace to take advan- <br />tage of both the timing situation and the good price. <br />Commissioner Wheeler noted that he is in favor of saving <br />money, but he just does not want to make a habit of this. <br />ON MOTION by Commissioner Wheeler, SECONDED by Com- <br />missioner Scurlock, the Board unanimously (4-0) <br />approved Change Order 1 to the existing referenced <br />Summerplace contract for extension of the water <br />main on 9th Avenue. <br />BOOK <br />Z 9 <br />JUN 2 '1390 <br />
The URL can be used to link to this page
Your browser does not support the video tag.