Laserfiche WebLink
HOF <br />JUI 10 <br />ENGINEERING FIRM SELECTION - 12TH STREET WATER LINE <br />The Board reviewed memo from the Utilities Director: <br />DATE: JUNE 28, 1990 <br />TO: JAMES E. CHANDLER <br />COUNTY ADMINISTRATOR <br />FROM: TERRANCE G. PINTO <br />DIRECTOR OF UTILI Y' RVICES <br />PREPARED HARRY E. ASHER <br />AND STAFFED ASSISTANT DIRECTO UTILITY SERVICES <br />BY: <br />SUBJECT: ENGINEERING FIRM SELECTION <br />12TH STREET WATER LINE <br />INDIAN RIVER COUNTY PROJECT NO. RLI90-74 <br />BACKGROUND <br />On April 25, 1990, the Department of Utility Services received <br />twenty-two (22) responses to its Request for Letters of Interest to <br />provide engineering services for the design, construction, and <br />inspection of the 12th Street Water Line. The selection committee <br />reviewed the twenty-two (22) responses and selected three (3) firms <br />to be interviewed. <br />ANALYSIS <br />On June 15, 1990, the selection committee interviewed the three (3) <br />firms, and as a result of the interview, ranked the firms as <br />follows: <br />1. Masteller and Moler Associates; Inc. <br />2. Carter Associates, Inc. <br />3. Professional Engineering Consultants, Inc. <br />RECOFDMMATION <br />The Department of Utility Services recommends that the Board of <br />County Commissioners authorize the Department of Utility Services to <br />conduct negotiations as to scope of work and cost, and to proceed <br />with an agreement with the first choice firm, based upon the outcome <br />_ of the negotiations. <br />ON MOTION by Commissioner Wheeler, SECONDED by Com- <br />missioner Scurlock, the Board unanimously approved <br />staff recommendation as set out above. <br />46 <br />