My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/9/1990
CBCC
>
Meetings
>
1990's
>
1990
>
8/9/1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:02:46 PM
Creation date
6/16/2015 9:13:10 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Bird wished to know who decides how far a study <br />needs to go at an intersection for example, and Director Keating <br />advised that is one criteria we are looking at and that is where <br />we are considering 50 of the site traffic itself or 50 trips, <br />whichever is least. <br />Commissioner Bird then asked if you build a commercial <br />project with 500 trips, who decides where those trips are going, <br />and .is it necessary to hire a traffic engineer. <br />Mr. Dudeck stated that staff can work with them on determin- <br />ing this - they look at it depending on location, and where you <br />have a more critical location, it would require an analysis. <br />Commissioner Bird continued to stress the need to save the <br />applicant's trouble as much as possible. <br />Commissioner Bowman left the meeting at 9:25 A.M. <br />Director Keating pointed out that if someone does not think <br />the figures in these tables are right, they can do their own <br />traffic count. <br />Chairman Eggert asked if there was anyone in the audience <br />who wished to speak on either the Concurrency Management or <br />Traffic Chapters. <br />Todd Smith, of Peterson & Votapka, Engineers, believed that <br />in the Comp Plan, it allows you to go up to 1,000 trips if you <br />are not in a critical transportation location and he felt the LDR <br />now will eliminate that ability completely. In regard to the use <br />of a project, Mr. Smith stated that if a developer comes in with <br />something like a strip building, for instance, with a certain <br />percent of the building to be used for offices, etc., the problem <br />they have been seeing is -'that staff tends to come back and hit <br />them with the highest uses.` In example, if the property is zoned <br />for a convenience store but the developer has no intention of <br />putting that use in his project, staff still says use that <br />figure. In their office they have even tried having restrictive <br />9 <br />U (i <br />AUG 09 19y 3F <br />90 1 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.