Laserfiche WebLink
A u G 14 1990 <br />0 <br />GC%HC.SFr K <br />F►FpllY� �p+VFi <br />4IfaGE d'S .• <br />u►hatts+o <br />�1 <br />'RSD -L 569 <br />Mr. Halback explained that Concept K assumes you may want to <br />take some of those out -parcels and look at them for increased <br />opportunities for surface parking. This concept gives you 589 <br />spaces instead of 535, and the cost of Concept K is approximately <br />19.25 million, or 19.36 million if you do the increased parking. <br />The difference between those numbers is in the cost of the <br />parking lot not the land. <br />Mr. Halback then referred to Concept L, as follows: <br />19 <br />1�rrArrt <br />1u<Ib:icl; <br />